Similar Projects
Five Points Intersection - Butler County
Infrastructure
Conception
$2,458,000 CJ est. value
Hamilton, OH 45011

Middletown Community Center - City of Middletown
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Middletown, OH 45044

Mercy Health-Fairfield Hospital Campus Expansion
Addition, Demolition, New Construction, Infrastructure - 30,000 SF
Design
$20,000,000 CJ est. value
Fairfield, OH 45014

Freddy's Frozen Custard & Steakburgers / Fairfield
New Construction, Infrastructure - 3,000 SF
Design
$900,000 CJ est. value
Fairfield, OH 45014

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Construction Manager at Risk Services - New Headquarters Fire Station and Three Prototype Satellite Fire Stations
New Construction, Infrastructure
Bidding
$15,110,000 CJ est. value
Middletown, OH 45044

South Union Road Roadway Improvements and Water Main Extension Project
Infrastructure
Post-Bid
Middletown, Monroe, OH 45044

CDBG and OPWC Water System Improvements, Phase 2 Project
Infrastructure
Post-Bid
$207,350 est. value
New Miami, OH

Sanders Drive and Leo Drive Water Main Replacement and Roadway Improvements
Infrastructure
Results
Hamilton, OH 45013

Shafor Road and Dutchland Area Water Main Replacement Project
Infrastructure
Results
$2,591,690 est. value
OH

Starbucks / Hamilton
New Construction, Infrastructure - 1,976 SF
Construction
$1,000,000 CJ est. value
Hamilton, OH 45011

Towne Mall Galleria / Middletown Multi-Purpose Entertainment Venue
Demolition, New Construction, Infrastructure - 492,200 SF
Pending Verification
$280,000,000 CJ est. value
Middletown, OH 45005

Storm Sewer - City Of Fairfield
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Fairfield, OH 45014

Anderson Farm Residential Subdivision
New Construction, Infrastructure
Conception
$2,300,000 CJ est. value
West Chester, OH 45069

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$610,000 CJ est. value
Martinsville, OH 45146

Last Updated 12/28/2022 09:34 AM
Project Title

Waterline Replacement, West Finely, North Hazel, West Walker Streets

Physical Address View project details and contacts
City, State (County) Middletown, OH 45044   (Butler County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $677,926 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall perform everything required to be performed and shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required for WATERLINE REPLACEMENT, WEST FINELY, NORTH HAZEL, WEST WALKER STREETS all in accordance with the plans and specifications as prepared by Brandstetter Carroll Inc., Cincinnati, Ohio, referred to herein as the "Engineer," which plans are made part of the Contract, and in strict compliance with the Contractor's Proposal and other Contract Documents shall do everything required by this Contract and the other documents constituting a part thereof. Project Locations: W. Finley St. N. Hazel St. To N. Eighth St. Prop. 8" Water Main N. Hazel St. W. Wyandot St. To W. Finley St. Prop. 8" Water Main W. Walker St. N. Hazel St. To N. Eighth St. Prop. 8" Water Main

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents