Similar Projects
Sharon Road Sidewalk Installation Project
Infrastructure
Bidding
$600,000 est. value
Menlo Park, CA 94025

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Daily City DMV Field Office
Term Contract, Infrastructure
Post-Bid
Daly City, CA 94015

Quick Build Pedestrian Improvements Project
Infrastructure
Post-Bid
$73,500 est. value
Millbrae, CA 94030

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Arborist,Tree and Other Plant Services
Infrastructure
Results
$250,000 est. value

Vegetation Abatement
Infrastructure
Post-Bid
Half Moon Bay, CA

Middle Avenue and Nealon Park Pedestrian Improvements Project
Infrastructure
Results
Menlo Park, CA

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Redwood City DMV Field Office
Term Contract, Infrastructure
Post-Bid
Redwood City, CA 94063

Hillside Boulevard Pedestrian Crossing Enhancements
Infrastructure
Results
South San Francisco, CA 94083

Street Sweeping Services
Term Contract
Post-Bid
Redwood City, CA 94063

Midcoast Multi-Modal Trail Improvements Project
Infrastructure
Results
$3,332,000 est. value
CA

Outdoor Improvements at Four Sites
Infrastructure, Alteration
Post-Bid
Pacifica, CA 94044

Caltrain Access and Bay Trail Gap Closure
Infrastructure
Results
South San Francisco, CA 94080

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

North Pacifica Pedestrian Improvement
Infrastructure
Results
Pacifica, CA

Last Updated 03/28/2022 06:40 AM
Project Title

Hopkins Avenue Traffic Calming Project

Physical Address View project details and contacts
City, State (County) Redwood City, CA   (San Mateo County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Maintenance, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,250,000 to $4,680,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project consists generally of: without limitation, install curb ramp and curb return improvements with associated roadway regrading, median islands with landscape and hardscape features, the expansion and beautification of the landscaped median at the intersection of Alameda de las Pulgas and Hopkins, speed humps, intermittent full depth roadway spot repair, and a 2-inch grind, overlay and restriping of the entire corridor.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents