Similar Projects
Dickeyville - Lancaster Const / Intersection Improvem / Recst
Infrastructure
Conception
$3,000,000 CJ est. value
Lancaster, WI 53813

Hazel Green - Platteville Construction / Resrf20
Infrastructure
Design
$7,000,000 CJ est. value
Livingston, WI 53554

Cassville - Lancaster Const / Mill and O'lay / Rsrf
Infrastructure
Design
$4,000,000 CJ est. value
Lancaster, WI 53813

City of Fennimore, Brownwood Road, Bronson Blvd. to Termini
Infrastructure
Bidding
$250,000 CJ est. value
Fennimore, WI 53809

Prairie du Chien, Irish Ridge Road; STH 27 to Bouska Road
Infrastructure
Bidding
$500,000 CJ est. value
Boscobel, WI 53805

Resurfacing Project on Rural Ridge Road South of CTH Q
Infrastructure
Post-Bid
$62,000 CJ est. value
Cuba City, WI 53807

Salt Shed
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Cuba City, WI 53807

Scot Substation Earthwork
Infrastructure
Results
Muscoda, WI

Dickeyville Industrial Park
New Construction, Infrastructure
Results
$2,475,000 est. value
Dickeyville, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Scenic Rivers Energy Cooperative Headquarters Building
New Construction, Infrastructure - 56,000 SF
Pending Verification
$7,000,000 CJ est. value
Lancaster, WI 53813

STH 133, Cassville - Patch Grove, 400 ft S CTH VV to STH 35, Grant
Infrastructure
Pending Verification
$9,000,000 CJ est. value
Mount Hope, WI 53816

River Ridge School Office & Entrance Addition & Remodel Rebid
Addition, Demolition, Build-out, Infrastructure - 3,865 SF
Bidding
$1,000,000 CJ est. value
Patch Grove, WI 53817

WWTF Upgrade 2021
Renovation, Infrastructure
Results
Dickeyville, WI

STH 133, Cassville - Patch Grove, 400 ft S CTH VV to STH 35, Grant
Infrastructure
Pending Verification
$9,000,000 CJ est. value
Mount Hope, WI 53816

Last Updated 11/02/2022 02:15 PM
Project Title

Red Barn Wind Farm

Physical Address View project details and contacts
City, State (County) Wingville, WI 53569   (Grant County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $162,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 28 turbines to generate 91.6 MW. Construction began in May 2022 and is scheduled to be operational by December 2022.* *Please visit https://alletecleanenergy.com/EnergySites/RedBarn for additional information.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents