Similar Projects
Scripps Elementary School - Lake Orion Community Schools
Renovation
Design
$4,000,000 est. value
Orion Township, MI 48360

Weston Elementary School - 2022 Bond - Kearsley Community Schools
Renovation
Design
$2,000,000 est. value
Burton, MI 48509

Construction Manger - Doyle-Ryder Elementary School
Renovation
Bidding
$2,750,000 est. value
Flint, MI 48503

Cook Elementary Renovations
Renovation
Post-Bid
Grand Blanc, MI 48439

Morley Stanwood Schools Series 1
Post-Bid
Morley, MI

Merritt Elementary School Redevelopment Project
Results
Merritt, MI 49667

2019 Bond Projects Additions & Renovations
Results
Pickford, MI

RUSD 2022 Bond Projects - Future Phases
Renovation
Design
$34,500,000 est. value
MI

Michigan Math and Science Academy
Renovation - 59,680 SF
Post-Bid
Warren, MI 48092

Willow Hill Elementary School Renovation- PHASE III
Renovation
Results
Traverse City, MI

Clio Elementary Renovations and Additions
New Construction, Renovation, Addition
Post-Bid
Clio, MI 48420

Centreville Elementary and Jr/Sr Building Improvements - Bid 2
Renovation
Results
Centreville, MI 49032

Elementary School Classroom Modifications
Renovation
Post-Bid
North Branch, MI

Misc. Site Improvements At Multiple Schools
Renovation
Results
$1,100,000 est. value
Owosso, MI

2019 Bond Bid Package 5B
Renovation
Post-Bid
Novi, MI 48374

Reported 06/29/2022 12:57 PM
Project Title

South Westnedge - 2022 Bond - Kalamazoo Public Schools

Physical Address View project details and contacts
City, State (County) Kalamazoo, MI 49009   (Kalamazoo County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected May 2024
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes asphalt paving, classroom improvements, Electrical, Lighting, Elevators, Solar Panels and Signage improvements, plumbing, and HVAC/cooling improvements. As of June 28, 2022, this project is in the conceptual phase. The bond has been approved. Information regarding a design firm and the general contractor selection timeline has not been disclosed. Per the owner, a firm timeline for construction has not been established, bidding and construction will occur over the next 5 to 7 years. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Elementary School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents