Similar Projects
Water, Sewer And Roadway At Woodlawn Commerce Park
Infrastructure
Bidding
Defuniak Springs, FL

5th Street Bridge Utility Relocation
Infrastructure
Bidding
$375,000 est. value
New Smyrna Beach, FL 32168

Parkside Water Main Replacement Project
Post-Bid
Hollywood, FL

Water Transmission System Subaqueous Crossings Pipeline Support Remediation and Signage
Post-Bid
Key West, FL 33040

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

Oleander Avenue Potable Water Main
Results
Less than $656,319 est. value
Mexico Beach, FL 32410

South Water Reclamation Facility Flow Meter Improvements
Infrastructure
Bidding
$2,186,000 est. value
Orlando, FL 32819

Construction Services For Epperson North District Improvements Pasco County
Post-Bid
Wesley Chapel, FL

Green Meadows Water Main Replacement
Results
Less than $250,000 est. value
Belleview, FL

Construction of Plastic Mains Materials and Services
Infrastructure
Bidding
Valparaiso, FL

Advanced Metering Infrastructure Program
Post-Bid
Clewiston, FL 33440

GTL Dewatering Building Drain/Vent Pipe Replacement
Results
Fort Lauderdale, FL 33316

Powell Creek Bypass Canal Water Quality Improvement
New Construction, Infrastructure
Bidding
North Fort Myers, FL 33917

Water System Interconnect Upgrades
Post-Bid
Pompano Beach, FL

Blountstown FY 2017 CDBG Project
Results
Blountstown, FL

Last Updated 12/21/2021 08:46 AM
Project Title

730 LF of 2" Water Main HDPE Poly Pipe Directional Bored Under a Sidewalk on SR 45 to Replace an Existing 2" Water Main

Physical Address View project details and contacts
City, State (County) Archer, FL   (Alachua County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

730 LF of 2” water main HDPE poly pipe directional bored under a sidewalk on SR 41 to replace an existing 2” water main. The new 2” water main will need to tie into 3 existing water service connections, connected to an existing 6” water main at each end of the new 2” water main and have 2” valves at each end. . The existing water main will need to remain in service during work and until the new water main has been pressure tested at 150 psi for 2 hrs., been disinfected and passed clearance bacteriological tests. The City of Archer will be responsible for clearance bacteriological tests.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents