Similar Projects
New Career Technical Education Center
New Construction - 160,000 SF
Design
Kalamazoo, MI

Scripps Elementary School - Lake Orion Community Schools
Renovation
Design
$4,000,000 est. value
Orion Township, MI 48360

BP 03 Maintenance Building - New Build
New Construction - 6,410 SF
Bidding
$2,000,000 est. value
Dewitt, MI 48820

Mcgrath Elementary Renovations
Renovation
Post-Bid
Grand Blanc, MI 48439

Additions and Remodeling at Eriksson, Field, Hulsing, and Dodson Elementary Schools
Renovation, Addition
Post-Bid
Canton, Plymouth, MI 48187

Richland Elementary
Addition - 37,000 SF
Results
Richland, MI 49083

Construction Management Services
Results
Clawson, MI

Air Conditioning and Quality Improvements Package 2 - 2022 Bond - Lansing School
Renovation
Design
$4,100,000 est. value
Lansing, MI

Fife Lake Elementary Rear Entry Modifications
Post-Bid
Fife Lake, MI 49633

Orchard Hills Elementary Remodeling and Village Oaks Elementary Remodeling
Renovation
Results
Novi, MI 48374

Caledonia and Kettle Lake Elementary Renovations
Renovation
Post-Bid
Alto, MI 49302

Merritt Elementary School Redevelopment Project
Results
Merritt, MI 49667

Michigan Math and Science Academy
Renovation - 59,680 SF
Post-Bid
Warren, MI 48092

Brown and Miller Elementary Schools Phase 3
Results
New Boston, MI 48164

Rose Pioneer Elementary Technology
New Construction
Post-Bid
Holly, MI 48442

Reported 06/23/2022 03:48 PM
Project Title

Weston Elementary School - 2022 Bond - Kearsley Community Schools

Physical Address View project details and contacts
City, State (County) Burton, MI 48509   (Genesee County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Construction Start Expected May 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes install a stormwater management retention system, expand drop-off center, construction of a entry vestibule addition, and replace the rest roof area. As of June 21, 2022, this design is in the design phase. The bond has been approved. An architect and engineer have been selected for the project. Per the owner, bidding is estimated to take place in winter of 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Elementary School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents