Similar Projects
Construction a Street Rebuild Projects 2020 Project
Bidding
Less than $1,000,000 est. value
Centerville, UT 84014

South Frontage Road Widening Project
Bidding
Less than $125,000 est. value
Centerville, UT 84014

Weber State Davis Campus Access Road
Post-Bid
Layton, UT 84041

Street Overlay Projects 2019
Post-Bid
$500,000 est. value
Centerville, UT 84014

DFCM Construction-Pre Qualification for General/Mechanical/Electrical/Roofing/Paving Contractors
Results
$3,500,000 est. value

2018 Crack and Slurry Seal Project
Results
Less than $400,000 est. value
Centerville, UT

Lot 4 at Hill AFB into a Fenced Material Storage Area.
Post-Bid
$5,000,000 to $10,000,000 est. value
UT

I-15 SR-232 to I-84 Widen Existing Facility
Results
$100,000,000 to $125,000,000 est. value

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

DDHU Lot 3 Repairs at Hill AFB, UT
Results
$5,000,000 to $10,000,000 est. value
Ogden, UT 84056

800 North - 2000 West to 3000 West Project
Post-Bid
Clinton, UT 84015

I-84; SR-26 to US-89
Results

Construction of the 2020 Road Improvement Project
Post-Bid
Syracuse, UT 84075

Jessis Meadow Street Reconstruction Project
Results
Less than $500,000 est. value
West Bountiful, UT

800 North Roadway Improvements 450 West to 50 West
Post-Bid
$1,736,000 est. value
Clearfield, Sunset, UT

Last Updated 02/07/2019 03:59 PM
Project Title

250 North CDBG Reconstruction from Main Street (SR-126) to 300 North

Physical Address View project details and contacts
City, State (County) Clearfield, UT   (Davis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $690,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above project; consisting of but not limited to the following items of work: mobilization; obtaining all bonds and insurance; removal of existing asphalt and roadbase materials; removal of existing curb and gutter, sidewalk and other concrete flatwork; removal of existing trees, decorative rocks and other landscaping improvements located in the parkstrip; removal of existing storm water catch boxes; furnishing and installing curb and gutter and sidewalk; furnishing and installing 970 feet of 8-inch pvc sanitary sewer pipe and manholes; furnishing and installing 1,420 feet of 8-inch C-900 DR-18 pvc culinary water pipe; remove and replace water meter services, gate valves, valve boxes and fire hydrants; furnishing and installing storm drain catch basins; furnish and install roadbase and bituminous asphalt roadway; restore all existing landscape improvements and materials in parkstrip and all appurtenant work
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents