Similar Projects
554-21-121 Replace Heat Pumps In CBS With Fan Coils
Term Contract
Design
$250,000 to $500,000 est. value
Aurora, CO 80045

General/Mechanical Prime Services of RTU Installation
Alteration
Bidding
$70,000 est. value
Thornton, CO 80241

Westminster Campus Science Lab HVAC Renovation
Term Contract
Sub-Bidding
$70,000 est. value
Westminster, CO 80031

HVAC and Mechanical Products
Term Contract
Post-Bid

Myec Zuni Parking Lot and HVAC
Post-Bid
Denver, CO 80211

Justice Center Two Cell Cooling Tower Replacement
Results
Brighton, CO 80601

Electrical - Justice Center Two Cell Cooling Tower Replacement Project
Results
Brighton, CO 80601

Energy Management Controls System (EMCS) Technical Service Agreement
Post-Bid
Aurora, CO

Perinatal Replace Chiller 2
Results
$150,000 to $175,000 est. value
Aurora, CO

Districtwide Refrigeration Maintenance and Repair Services
Post-Bid
CO

Heat Exchanger Tube Bundles
Results

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Services
Term Contract
Results
Denver, CO

Refrigerated Centrifuge
Term Contract
Post-Bid
Denver, CO

HVAC Upgrades Building 753
Results
Denver, CO

Last Updated 05/19/2022 05:57 PM
Project Title

Roof Top Unit Replacement

Physical Address View project details and contacts
City, State (County) Denver, CO 80221   (Adams County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace 8 existing Carrier Rooftop Units (RTU) on the Mapleton Administration Building. Remove and properly dispose of existing HVAC equipment: • Mapleton Public Schools will recover the refrigerant from units prior to disposal. • Procure and install new RTU of Daikin or Aaon. • Procure and install new supply fan variable speed drive. • Proposed/installed Unit weight shall not exceed 5% above existing HVAC unit weight. • Reuse existing curbs on the roof, provide curb adapter if necessary. • Install new disconnect switch and conduit to the new units.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents