Similar Projects
WUD 9 - Roof Drain Replacement and Repairs
Term Contract
Bidding
Boca Raton, FL 33428

Belle Glade Senior Center
Post-Bid
Belle Glade, FL 33430

Annual Contract - Roofing
Term Contract
Post-Bid
West Palm Beach, FL 33411

Roofing Rehabilitation/Replacement Services
Term Contract
Results
West Palm Beach, FL 33412

Roof Systems Maintenance, Repair, Installation and Evaluation
Term Contract
Results

Roofing Envelope Services
Post-Bid

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Robinson Village Re-Roofing
Post-Bid
$175,000 to $190,000 est. value
West Palm Beach, FL 33407

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roof Coating of Florida Highway Patrol(Fhp)Troop K Building #4715 Lake Worth, Florida`S Turnpike Mainline(Sr 91), Milepost 94.0
Post-Bid
Greenacres, FL 33467

PBCHA Dyson Circle Apartments Hurricane IRMA Roofing Repairs
Results
West Palm Beach, FL 33407

WUD Digester Building 1 and 2 - Roof Replacement
Post-Bid
Boynton Beach, FL 33437

VFW Roof Replacement
Results
Less than $38,000 est. value
Palm Springs, FL 33461

Mayme Frederick Service Center - Roof Replacement
Term Contract
Post-Bid
West Palm Beach, FL 33404

Frontier Elementary School - Roof Replacement
Results
$34,925 est. value
Loxahatchee, FL 33470

Last Updated 07/17/2020 11:39 AM
Project Title

Lake Worth Community High School - Roof Replacement

Physical Address View project details and contacts
City, State (County) Lake Worth, FL 33460   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,112,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Roof replacement and recovery of campus roofing assemblies includes roof replacement of approximately 32,180 s.f. of roof area on buildings 2, 14 and areas of building 10, and roof recovery of approximately 47,959 s.f. of roof area on buildings 1, 5, 6, 7 and areas of building 10. Complete roofing replacement, recovery and coating of designated roofing assembly components on buildings 1,2,3,5,6,7,8,9,10 and 14 of Lake Worth High School. Work includes removing existing components and reinstall during the roofing process, remove and reinstall lightning protection, remove existing roof system down to the existing substrate, replacement of deteriorated areas, removal of asbestos containing material, remove and reinstall existing roof drains, fabricate and install 24Ga stainless steel flashing, removal of existing pourable sealant and install new pourable sealant, repair parapets and clerestory walls, installing granule walkway system, removing mod bit aluminum tape and applying strips of reinforced coating.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents