Similar Projects
Bender Lane Multi-Family Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Sheridan, WY 82801

North Sheridan Interchange - City of Sheridan
Infrastructure
Conception
$700,000 CJ est. value
Sheridan, WY 82801

SCSD 2 Maintenance Facility Safety Upgrades and Repairs
Renovation, Infrastructure - 9,360 SF
Design
$450,000 CJ est. value
Sheridan, WY 82801

Resurface Roads and Parking Lots for Storm Water Management Plan Phase 3
Infrastructure
Bidding
$10,000,000 CJ est. value
Sheridan, WY 82801

Sheridan County Brooks Street Greenspace
Infrastructure
Bidding
$1,850,000 CJ est. value
Sheridan, WY 82801

Wolf Creek Road Reconstruction Project
Infrastructure
Post-Bid
$240,000 CJ est. value
Ranchester, WY 82839

Replace Building 9 Stairs and ADA Ramp
Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Sheridan, WY 82801

Brooks Street Paving and Retaining Wall
Infrastructure
Results
$620,348 CJ est. value
Sheridan, WY 82801

Riverstone Park Residential Subdivision
New Construction, Infrastructure
Pending Verification
$25,400,000 CJ est. value
Sheridan, WY 82801

Falcon Motors Manufacturing Complex
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Sheridan, WY 82801

The Powder Horn Pro Shop
New Construction, Infrastructure - 2,000 SF
Conception
$500,000 CJ est. value
Sheridan, WY 82801

SCSD2-SHS Stadium Athletic Lighting Upgrade
Infrastructure
Bidding
$80,000 CJ est. value
Sheridan, WY 82801

Blacktooth Park Phase III Project
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Sheridan, WY 82801

Wrench Ranch Master Plan Phase 1
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Sheridan, WY 82801

RFP D/B - Design and Construct the Repairs for the Bridge Decking Along the West 5th Street Bridge
Infrastructure
Post-Bid
$500,000 CJ est. value
Sheridan, WY 82801

Last Updated 03/22/2023 05:06 PM
Project Title

Acme Diversion Fish Passage Project

Physical Address View project details and contacts
City, State (County) Ranchester, WY 82839   (Sheridan County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $100,600 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Notice is hereby given that the Sheridan County Conservation District (SCCD) will receive sealed bids for the furnishing of all labor, materials, tools, appliances, transportation, and services necessary for: Demolition of the existing sheet pile diversion dam at the Acme Powerplant and construction of a riprap rock ramp. Each bid must be accompanied by a bid bond with sufficient surety, or a certified check or cashier's check, or bank draft on a reputable bank, for not less than five percent (5%) of the total amount of such bid, payable to, and to be forfeited to, the SCCD as liquidated damages if bidder fails to enter into contract within sixty (60) days after award to him, or fails, at the time of executing the agreement, to furnish a performance and payment bond in the amount of one hundred percent (100%) of the bid. Facsimile (fax) or other copies of bonds are not acceptable, nor are certified or cashier's checks which have an expiration date of less than one year. No bid will be considered if not accompanied by such bond, certified or cashier's check or bank draft, or if not in conformance with the provisions of Section 15-1-113, W.S. 1977. Preference is hereby given to materials, supplies, equipment, machinery and provisions produced, manufactured, supplied or grown in Wyoming, quality being equal to articles offered by competitors outside the State, as provided in W.S. 16-6-101 through 16-6-119. SCCD reserves the right to reject any and all bids and the right to waive irregularities in bids received.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents