Similar Projects
BL000A Crescent Steam Tunnel Repairs
Results
Bloomington, IN

Lake Deturk Dam Spillway Improvements Phase I
New Construction
Post-Bid
Martinsville, IN 46151

Upper Wildwood Dam Rehabilitation
Renovation
Results
Camby, IN

Replace Superstructure
New Construction, Demolition
Design
$3,378,000 est. value
Brownstown, IN

BL243 Teter Quad Tunnel Waterproofing
Renovation
Results
Bloomington, IN 47406

Small Structure Replacement
New Construction, Infrastructure
Results
$569,344 est. value
Danville, IN

Cannelton Locks and Dam Floating Mooring Bitt Track Repairs
Renovation
Results
$1,000,000 to $5,000,000 est. value
Cannelton, IN 47520

Dam Removal
Renovation
Post-Bid
Logansport, IN

Dam Removal on Sugar Creek
Post-Bid
Crawfordsville, IN

Tunnel and Tunnel Infrastructure Repairs
Renovation
Results
Less than $2,000,000 est. value
West Lafayette, IN 47907

Goshen Pond Dam Improvements
Renovation
Post-Bid
Goshen, IN

Tunnel T-12 Repairs 2021
Results
Terre Haute, IN

Weir Dam Removal
Renovation
Post-Bid
Richmond, IN 47374

Small Structure Replacement with Bridge
New Construction, Infrastructure
Results
$2,875,563 est. value
Bloomfield, IN

Reported 06/25/2022 12:00 AM
Project Title

Hoosier NF GAOA Springs Valley Dam Improvement

Physical Address View project details and contacts
City, State (County) Bedford, IN 47421   (Lawrence County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of armoring Springs Valley Lake dam. The work consists of placing rip rap along the face of the dam at the waterline. The project area has an access road that runs along the edge of the tree line. The access has been hardened with aggregate. The top of the dam which is part of the trail system has also had the trail hardened with aggregate. The project has two optional work Items that will be awarded based on available funding at the time of the project award.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents