Similar Projects
Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Conception
$1,500,000 CJ est. value
Glasgow, KY 42141

Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
Less than $10,660,000 est. value
Glasgow, KY 42142

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Street Paving
Post-Bid
Glasgow, KY

Grade and Drain With Asphalt Surface
Results
KY

Grade and Drain With Asphalt Surface
Infrastructure
Results
KY

Address Pavement Condition of Louie B. Nunn Cumberland Parkway
Infrastructure
Conception
$4,400,000 CJ est. value
Glasgow, KY 42141

T-Hangar Site Grading
Infrastructure
Post-Bid
Glasgow, KY

1.26 Miles Asphalt Resurfacing
Infrastructure
Results
KY

Street Paving
Term Contract
Post-Bid
Glasgow, KY

Asphalt Pavement and Roadway Rehabilitation
Infrastructure
Results

Pavement (With Alternates). - Louie b Nunn Cumberland Parkway (Ln 9008) (Mp 0.000)
Infrastructure
Results
KY

Asphalt Pavement and Roadway Rehab (PW-9008)
Infrastructure
Results
KY

CS 1201 - Grade and Drain With Asphalt Surface
Infrastructure
Results
KY

Happy Valley Road (KY 90) (MP 9.498) - Pavement(with Alternates)
Infrastructure
Results
KY

Last Updated 08/23/2022 02:02 AM
Project Title

Address Pavement Condition of AC Pavement

Physical Address View project details and contacts
City, State (County) Glasgow, KY 42141   (Barren County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Address Pavement Condition of AC Pavement Milepoints: From: 1.692 To : 2.523 Purpose and Need: Asset Management / AM-pavement (Pri)(P) As of August 23, 2022, the project is in conceptual status. Anticipated letting year is 2026. KYTC - Address Pavement Condition of AC Pavement *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents