Similar Projects
Joint Outfall H - Unit 2B Trunk Sewer Rehabilitation
Infrastructure
Bidding
$2,300,000 CJ est. value
Whittier, CA 90601

Repair Services for Back-Flow Devices
Term Contract
Sub-Bidding
Los Angeles, CA 90012

Conduit, Polyvinyl Chloride (pvc)
Term Contract
Sub-Bidding
Los Angeles, CA 91405

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

As Needed Plumbing Maintenance and Repair for Met In-Town Housing (Multiple Locations)
Alteration
Post-Bid
$240,000 est. value
Los Angeles, CA 90012

Orchard Dale Elementary School Modernization Project- Plumbing
Alteration
Results
Whittier, CA 90603

As Needed Plumbing Maintenance and Repair for Metropolitan`s Gene Pumping Pump Plant
Term Contract
Results
$240,000 est. value
Los Angeles, CA

Purchase of (1) New Potable Deep Well Pump-Pump#32 and a Refurbishment of the Existing Discharge Head and Packing Box
Term Contract
Sub-Bidding
Pomona, CA 91766

As Needed Plumbing Maintenance and Repair for Metropolitan's Eagle Mountain Pumping Plant Housing
Term Contract, Alteration
Post-Bid
$240,000 est. value
Desert Center, Los Angeles, CA 90012

Waste and Vent Lines Re-Pipe
Alteration
Results
$25,000 est. value
Los Angeles, CA

Septic System Pumps
Infrastructure
Sub-Bidding
$800,000 CJ est. value
Malibu, CA 90265

As Needed Plumbing Maintenance and Repair for Metropolitan`s Hinds Pumping Pump Plant Housing
Term Contract, Alteration
Post-Bid
$240,000 est. value
Los Angeles, CA 90012

Clamps. FRP Pipe Repair Stainless Steel
Infrastructure
Results
$26,561 CJ est. value
Los Angeles, CA 90012

WC Devices 2022
Term Contract
Sub-Bidding
Los Angeles, CA 90012

As Needed Plumbing Maintenance and Repair for Metropolitan's Iron Mountain Pumping Pump Plant Housing
Term Contract
Post-Bid
$240,000 est. value
Los Angeles, CA

Last Updated 02/16/2023 08:03 PM
Project Title

RFQ Contractor - Beverly Hills Civic Center Chilled Water Pipe Replacement

Physical Address View project details and contacts
City, State (County) Beverly Hills, CA 90210   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant work necessary for Chilled Water Lines Replacement at 464-455 N. Rexford Drive, Beverly Hills, CA 90210 as described in the drawings and specifications. The base scope of work consists of the replacement of certain sections of chilled water supply and return piping at City Hall Levels 1 through 3 from the Central Plant located at the basement level of Police facility at 464 N. Rexford Dr. New pipe supports and insulated pipe with connections to the air handlers in the mechanical rooms shall also be provided. All required testing and balancing reports shall be provided once the project is complete and approved by the City Online Q&A Yes Q&A Deadline 02/10/2023 2:00 pm For the first floor, the replacement chilled water supply and return piping will be supported every eight feet. The new piping on the first floor will be extended to connect to the first-floor air handler. The piping will also be extended to the south air handler. The hard lid ceiling in the bathroom and hallway can be opened to provide access to the new piping route. There will alsobe 1-1/2" thermal insulation provided for the new piping. The replacement chilled water supply and return piping will be supported every eight feet for the second floor as well. A new connection to the bridge's air handler will be provided. The hard lid ceiling on the east side of the second floor can be opened to provide access to the new piping route. On the east side of the floor, piping can be run down to the first-floor mechanical room. Floor core and soffit will be provided to conceal the new piping. The piping will be connected from the new lines to the second-floor air handlers. On the west side of the second floor, 2-1/2" chilled water supply and return piping will be provided down to the first floor. For the third floor, 4" chilled water supply and return piping will penetrate down from the roof to the third-floor mechanical room. A roof penetration detail is included on the plans. 4" chilled water supply and return pipe will penetrate down to the second-floor ceiling space. An elevated section view of the piping route is provided on the plans. Any questions regarding the questionnaire and qualification package should be submitted via PlanetBids by 2:00PM, February 10, 2023.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents