Similar Projects
Water Supply Well and Irrigation Well
Infrastructure
Bidding
$300,000 est. value
Roscommon, MI

Cell 7 Phase 4 Construction - Land Preserve
Infrastructure
Bidding
$5,000,000 est. value
Riverview, MI

OTT Story Superfund Site Operable Unit #2 Groundwater Remedy - Phase I
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Muskegon, MI

2021 Six-Inch (6") Trailer Mounted Centrifugal Trash Pump Purchase
Post-Bid
Mount Pleasant, MI

Water Well and Yard Hydrant Installation
Results
Rochester, MI 48306

Palmer 3 Well Field Rehabilitation
Results
Owosso, MI 48867

Bypass Pump
Infrastructure
Bidding
Brighton, MI 48116

2016 Bond Projects - Bailey Lake Elementary Well System Improvements
Post-Bid
Clarkston, MI 48348

One (1) Paco Pump
Results
Rochester Hills, MI

William Stone #1 Orphan Well Project
Renovation
Post-Bid
Lansing, MI

Submersible Pump
Results
Harrison Township, MI 48045

Wet Well Vactoring
Infrastructure
Post-Bid
Brighton, MI

Wastewater Treatment Plant West Screw Pump Replacement
Results
Big Rapids, MI

Leachate Pump and Sump Drainer
Infrastructure
Post-Bid
Livonia, MI

Repair of Vertical Turbine Industrial Pump 2
Results
Midland, MI

Reported 05/26/2022 12:00 AM
Project Title

Ground Water Well Maintenance Program

Physical Address View project details and contacts
City, State (County) Sterling Heights, MI   (Macomb County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The South Macomb Disposal Authority (SMDA) oversees three (3) closed landfill sites located in Macomb County, Michigan. Site 9&9A is located at 24 Mile and Foss Roads in Macomb Twp., Site 11 Located at 31 Mile and Mound Roads in Washington Township, and the Freedom Hill and Fostoria Landfills located at Metro Parkway and Utica Roads in Sterling Heights.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents