Similar Projects
Interstate 81 over West Foothills Drive
Infrastructure
Conception
$6,958,544 CJ est. value
Drums, PA 18222

SR 315 over Reading Blue Mt and Northern Railroad
Infrastructure, Renovation
Conception
$2,950,000 CJ est. value
Pittston, PA 18640

SR 1012 over Tributary Harvey's Creek
Demolition, New Construction, Infrastructure, Renovation
Design
$750,000 CJ est. value
Jackson Township, PA 18708

I-80 EB over I-81 NB/SB
Infrastructure
Design
$16,152,468 CJ est. value
Butler Township, PA 18222

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

4610--Central Service Reverse Osmosis System
Post-Bid
Wilkes-Barre, PA 18702

Site and Utility Relocation Work in Allen Street
Infrastructure
Post-Bid
Hazleton, PA 18201

Emergency Repairs of Water and Sewer Lines
Term Contract
Results
Sugarloaf, PA

Municipal Building Utility Service Upgrades
Infrastructure
Results
Hanover, PA 18706

New Jersey Central Railroad Train Station Improvement
Renovation - 32,000 SF
Construction
$1,200,000 est. value
Wilkes-Barre, PA 18704

Loomis Roundabout Improvement Project
Construction
Ashley, PA 18701

I-80 over Lehigh River Bridge Project - Pennsylvania Department of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$52,000,000 CJ est. value
White Haven, PA 18661

Hazelton Beltway Center
New Construction, Infrastructure - 3,948,000 SF
Pending Verification
$426,000,000 CJ est. value
Hazle Township, PA 18202

Rogers Avenue over Solomon Creek
Demolition, New Construction, Infrastructure
Conception
$1,100,000 CJ est. value
Ashley, PA 18706

I-81 NB Grinding Luzerne
Infrastructure
Design
$205,800,000 CJ est. value
Mountain Top, PA 18707

Last Updated 12/02/2022 10:37 AM
Project Title

2019 Water Main Replacement

Physical Address View project details and contacts
City, State (County) Hazleton, PA 18202   (Luzerne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,260,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 2, 2022, the project has been awarded. A timeline for construction has not been confirmed. CLARIFICATION DEADLINE 5/27/2022 4:00 PM A certified check or bid bond drawn to the order of the Hazleton City Authority - Water Department in an amount equal to ten percent (10%) of the bid must be submitted with each proposal as bid security and received at the Authority's Office with all other required bid documents prior to the Bid Opening. Bidders shall comply with all procedures and requirements of the Contract Documents. The HCA encourage DBEs, including MBEs and WBEs, to submit a bid proposal. All Prime and subcontractors shall make the required good faith efforts when subcontracting and shall provide all documents to substantiate their search prior to award. Prior to the award of any Contract, the successful bidder shall furnish to the Owner Certificates of Insurance, Performance Bond, Labor and Material Payment Bond, American Steel certifications, DBE/WBE Compliance Documents, and any other items as required by the Contract Documents. The Hazleton City Authority - Water Department hereby reserves the right in its discretion, which is understood and agreed to by all bidders, to reject any and all bids submitted, and also reserves the right to waive any irregularities, omissions, mistakes, or informality in the Bidding Process. Anticipated Award and Construction Dates: a. Bid Award: June 7, 2022 b. Contract Signing: June 24, 2022 c. Pre-Construction Meeting: September 8, 2022 d. On-Site Work Commencement Date: September 12, 2022 e. Substantial Completion: March 5, 2024 f. Final Completion: September 1, 2024 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents