Similar Projects
New Fire Department Headquarters
New Construction
Conception
McKinney, TX

Fire Station #6
New Construction
Conception
Mansfield, TX

Fire Station 2
New Construction
Design
$4,500,000 est. value
Humble, TX 77338

Fire Station #43
New Construction
Design
$5,000,000 est. value
Fort Worth, TX

New Fire Station 52
New Construction - 12,967 SF
Bidding
$4,500,000 est. value
Fresno, TX 77545

Emergency Operations Center and Police Department Renovation
New Construction
Bidding
$5,240,000 est. value
Deer Park, TX 77536

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

City of Duncanville Fire Station #1
New Construction - 15,500 SF
Post-Bid
Duncanville, TX 75116

Temporary Buildings and Dome Structures
New Construction - 7,700 SF
Results
$145,196 est. value
Dallas, TX 75230

Cibolo Fire Station #3
New Construction - 7,878 SF
Results
Less than $2,300,000 est. value
Cibolo, TX 78108

Fire Station 6
Construction
League City, TX

Aldine Fire Rescue Station No. 11
New Construction - 15,185 SF
Construction
Houston, TX 77032

Fire Station #7
New Construction - 14,300 SF
Pending Verification
Pearland, TX

Police Training Center
Renovation - 1,700 SF
Pending Verification
Pearland, TX

Fire Station 1 Remodel
Renovation
Conception
$2,000,000 est. value
San Marcos, TX 78666

Reported 05/03/2022 08:41 AM
Project Title

New Fire Station

Physical Address View project details and contacts
City, State (County) Kilgore, TX 75662   (Gregg County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is construction of a new Fire Station in Gregg County Emergency Services District No. 2, including the possible incorporation of an existing building on the site. The following are preliminary requirements for the project, which are subject to change as the design process progresses: architect must understand need to meet NFPA 1500 requirements, 3-5 Fire Apparatus drive thru bays, 6 sleeping dorm rooms, 4 restrooms/showers, fitness room, conference/training room, 911 communications/dispatch center, EMS medical storage, decontamination room, offices, kitchen, and helicopter landing pad.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents