Similar Projects
Last Updated | 01/05/2024 02:03 AM |
Project Title | Jamestown Public Schools Capital Improvement Project Phase 2 at Jamestown High School - BP-01 Site Work |
Physical Address | View project details and contacts |
City, State (County) | Jamestown, NY 14701 (Chautauqua County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Middle/Senior High School, Site Development |
Contracting Method | Construction Management - CM at Risk, Competitive Bids |
Project Status | Bidding, Construction start expected June 2024 |
Bids Due | View project details and contacts |
Estimated Value | $1,453,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Question Deadline 01/11/2024 at 5:00 PM ET All questions are to reference a drawing number or specification section with page number. 1. Richard Krouse, rkrouse@youngandwright.com 2. Alyssa Catlin, alyssa@yougnandwright.com 3. Mark Dowling, wdowling@tcco.com 4. Joe Redmond, jredmond@tcco.com, Reponses will be in the form of addendum only. Area A Basement Renovations: Cafeteria Rebuild: Cafeteria Expansion, New Floors, wall finishes, Ceilings, Lights. Addition of bathrooms Replacement of HVAC units, Demolition of existing Courtyard room & Rebuild of a new Raised Roof Structure including clearstory window feature. Substantial Concrete floor slab replacement in conjunction with new structure that is required for the Roof rebuild. Removal and Replacement of Serving Line Equipment & Associated utilities. Kitchen Renovation: Removal & Replacement of all Kitchen Equipment. Renovation of the back-of-house Area behind kitchen. Relocation of Dry Storage area & Coolers & Freezers. New Floors, Base, lights & Wall Finsihes. Corridors Renovation: New floors, Wall finishes & Ceilings. Locker Replacements. Restrooms: Relocation of Gang Toilet Rooms. Receiving Area: Renovation of Maintenance Office, storage rooms and Receiving Area Entrance. Area A 1st Floor Renovations: Secure Entry: Floor Replacement, Door relocation, associated Heating, Access Controls. Cafeteria Grand Entry Stair: Modifying the Existing Main office & Copy Room to provide Stairwell opening to Cafeteria. o 2nd Floor Renovation: Classrooms: Converting 32 existing classrooms to 21 Larger classrooms. These are full renovations, including floors, lights, ceilings, new walls, Display & teaching walls, doors and all associated HVAC, Electrical & Plumbing. Corridors: New floors, lights, ceilings, wall tile, Lockers, UV's and Smoke Barrier Doors. Drinking fountain replacements, Security Cameras & Life Safety Fixtures (Fire extinguishers, wayfinding, etc.) Restrooms: New Gang Toilet & Single Occupant Restrooms including fixtures, partitions and accessories. Offices: Teacher office spaces, to include new floors, walls, ceilings, lights and associated HVAC. o Roof Replacement & Recovery: Areas A, B, AND Portion of D as Roof Recovery Roof area C & Portions of D roofing Replacement Skylight Replacements & Infills. o Parking Lot Replacement: Main Parking Lot Mill & Topping Retaining wall Replacements & Refinishing Guard Rail Replacements Drainage Modifications Loading Dock, Concrete Stairs & railings. o Miscellaneous Areas of renovation including: Auditorium: Minor Historical Plaster Repair and Associated Paint Restoration, Plenum (Attic Space) Ventilation system. Additional Auditorium Scope part of Alternate #5 IT Office Suite: Area C Full Tech. Office renovation, new exterior window & door openings, Secure vestibule, security window & Reception desk. Associated HVAC & Plumbing work. Gym & Mezzanine: Addition of AC to old Gym Space. (Full Gym renovation part of Alternate #1.) CER Rooms: CER room buildouts to house Technology Data Racks for the HS cabling work. o Building Systems: Fire Alarm: Full system replacement Cabling: Recalling the HS Building Misc. Plumbing: Drinking Fountain Replacement Fire Suppression: (Area A Basement renovation areas) Mechanical Upgrades: Replacement of Main building RTUs. Associated Dunnage modifications. o Exterior Building: Large Window Replacement Project in area A & B, Associated HM removals. Door opening modifications at IS suite & Receiving Areas. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |