Similar Projects
Bland Tract Subdivision
New Construction, Infrastructure
Conception
$55,000,000 CJ est. value
Statesboro, GA 30461

Replace Water Main on West Main Street - WWD-14-W - City of Statesboro
Infrastructure
Conception
$500,000 CJ est. value
Statesboro, GA 30458

SR 67 Bypass From S of SR 67 to SR 26
Infrastructure
Design
$4,000,000 est. value
Statesboro, GA 30459

Veterans Memorial Parkway Multi-Residential Development
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Statesboro, GA 30458

Maintenance Shop Covered Extension
Addition, Demolition, Infrastructure
Bidding
$360,000 CJ est. value
Statesboro, GA 30458

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Stillwell Street and Zetterower Avenue Intersection Improvements
Infrastructure
Post-Bid
Statesboro, GA 30458

Miller Street Extension and Colfax Station Road Maintenance Upgrades Project
Results
Statesboro, GA 30458

2021 LMIG Project
Results
Mount Vernon, GA

Bland Avenue Drainage Improvements - STM-42 - City of Statesboro
Infrastructure
Conception
$250,000 CJ est. value
Statesboro, GA 30458

FedEx
Infrastructure
Post-Bid
Statesboro, GA 30458

Blue Mile Utility and Streetscape Phase 1
Results
$3,956,569 est. value
Statesboro, GA

Chandler Road Near Olympic Boulevard Culvert Replacement - STM-40 - City of Statesboro
Infrastructure
Conception
$1,500,000 CJ est. value
Statesboro, GA 30458

FDM-20 Parking Lot Paving
Infrastructure
Post-Bid
Statesboro, GA

Street Resurfacing FY 2021
Results
$985,876 est. value
Statesboro, GA

Last Updated 09/24/2022 08:33 AM
Project Title

Cawana Road at Brannen Street & Cawana Road at S&S Railroad Bed Road Intersection Improvements - ENG-123f - City of Statesboro

Physical Address View project details and contacts
City, State (County) Statesboro, GA 30458   (Bulloch County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This area is currently growing with the construction of schools, churches, walking trails, and residential housing. The area is still largely undeveloped, but expected to become a prime area for development. This CIP is to prepare for that growth. A traffic study of this area indicated intersection improvements would improve the level of service of this road network due to increased traffic upon development. This CIP will help construct those improvements as they are needed (e.g. construct designated right/left turn lanes). This project is in included in the City's or County's FY 2023-2028 Capital Improvement Plan (CIP). As of September 24, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents