Similar Projects
Last Updated | 12/20/2022 11:02 AM |
Project Title | Replace Outdoor Chillers Abraham Lincoln Presidential Library and Museum Complex |
Physical Address | View project details and contacts |
City, State (County) | Springfield, IL 62701 (Sangamon County) |
Category(s) | Entertainment/Recreation, Government/Public |
Sub-Category(s) | Library - Public, Museum |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected November 2022 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $559,792 [brand] Estimate |
Plans Available from | Electrical Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project shall replace three air cooled chillers and associated pumps, piping, controls and electrical as indicated herein. Due to the COVID-19 Emergency, bids will only be accepted via mail or email. No In-Person submittals of bids will be allowed. Bid modifications will only be accepted via email. No faxed bid modifications will be allowed. All bids will be received at the CDB Springfield Office only. No bids will be received at the CDB Chicago Office or CDB Carbondale Office, and any packages mailed to the CDB Chicago Office or CDB Carbondale Office will not be forwarded to the CDB Springfield Office and will be considered disqualified. Bid security must be submitted with each bid equal to 10% of the base bid and must be in the form of a CDB bid bond, certified check, cashier's check or bank draft. Refer to Article 00 43 13 of the Standard Documents for Construction. THE CONDITION OF THIS OBLIGATION is that if Principal, upon acceptance by Obligee of its bid within the period of time specified for acceptance, shall comply with all post award requirements as required by the terms of the bid within the time specified after date of the Notice of Award, or in the event of the failure to comply with all post award requirements, if Principal shall pay Obligee (1) for all costs of procuring the work which exceeds the amount of its bid, or (2) shall pay Obligee the amount of this bond as liquidated damages in the event Principal is a sole bidder and after an attempt to secure other bids by readvertising none can be obtained, then this obligation shall be null and void; otherwise it shall remain in full force and effect. |
||||||||||||||||||||||||||||||||||||||||||
Details | 4 Stories Above Grade, 100,000 SF.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |