Similar Projects
US 190: 0.5 Mi W Of LA 978 - LA 976
Infrastructure
Design
$30,000,000 CJ est. value
Livonia, LA 70755

Beamon Road Over Bayou Maringouin
Demolition, New Construction, Infrastructure
Design
$2,500,000 CJ est. value
Fordoche, LA 70732

New Water Well and Site Improvements Project
Infrastructure
Post-Bid
New Roads, LA

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

2022 District 7, 9 Road Improvements
Infrastructure
Results
$2,493,427 CJ est. value
Mandeville, LA 70448

Mississippi River and Tributaries Project, New Roads Ferry Landing Sand Boil, Pointe Coupee Parish
Infrastructure
Results
$1,000,000 to $5,000,000 est. value
Batchelor, LA

LA 10 Roadway Flooding: 0.2 Mi W Of LA 1
Infrastructure
Design
$500,000 CJ est. value
Morganza, LA 70759

Audubon Estates Subdivision Residential Construction, Phase II
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
New Roads, LA 70760

LA 1: Byu Moreau and Lateral W15#7a Brs
Demolition, New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Morganza, LA 70759

Lift Stations Backflow Preventative Maintenance Service
Renovation, Infrastructure
Post-Bid
Reserve, LA

Service Road Construction - False River Regional Airport
Infrastructure
Design
$300,000 CJ est. value
New Roads, LA 70760

Mississippi River and Tributaries, Old River Complex, Old River Lock, Emergency Bulkhead Refurbishment, Pointe Coupee Parish, Louisiana ED 22-020
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Lettsworth, LA 70753

La 1: S Jct La 1 - N Jct La 1
Infrastructure
Design
$2,500,000 CJ est. value
Morganza, LA 70759

La 78: US 190 - La 1
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Livonia, LA 70755

LA 15: LA 1 - Concordia P/L
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Lettsworth, LA 70753

Last Updated 07/08/2023 12:03 AM
Project Title

Rwy 18 Rpz Obstruction & Wildlife Mitigation Phase I-loc/dme Access Drive Site Improvements & Perimeter Fencing

Physical Address View project details and contacts
City, State (County) New Roads, LA 70760   (Pointe Coupee County)
Category(s) Heavy and Highway, Sewer and Water, Transportation
Sub-Category(s) Airline/Passenger Terminal, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $209,840 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

6' Chainlink Fence with 3 Strand Barbed Wire and Aggregate Surface Course Access Drive. This project consists of providing perimeter fencing of the northern end of the False River Regional Airport property. The fencing will consist of a 6' chain-link fence with 3 strand barbed wire, approximately 1,334 linear feet. Additionally, a 695-foot crushed aggregate drive will be constructed providing access to the electrical vault. Ancillary infrastructure will consist of earthwork, drainage, and existing fence removal. 3-22-0074-0025-2023

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents