Similar Projects
Pleasant Ridge Mixed-Use Development
New Construction
Conception
Cincinnati, OH 45213

Bond Hill Senior
New Construction - 40,245 SF
Conception
$13,069,910 est. value
Cincinnati, OH 45237

The Summit PSH
New Construction - 45,600 SF
Design
$10,154,432 est. value
Cincinnati, OH 45237

"The Node" Mixed-Use Development
New Construction - 305,060 SF
Design
$10,000,000 CJ est. value
Cincinnati, OH 45220

Pennrose College Hill Station Mixed Use Development
New Construction - 200,500 SF
Post-Bid
$24,000,000 est. value
Cincinnati, OH 45224

Willkommen Project
Renovation - 1,379,100 SF
Post-Bid
$50,000,000 est. value
Cincinnati, OH 45202

Commons at South Cumminsville
New Construction - 180,792 SF
Construction
Cincinnati, OH 45229

Peters Cartridge Factory
Renovation
Construction
$23,000,000 est. value
Cincinnati, OH 45208

Victory Parkway Apartments
Renovation - 40,000 SF
Pending Verification
$3,000,000 est. value
Cincinnati, OH 45206

Lincoln & Gilbert Family
New Construction - 45,912 SF
Conception
$11,757,544 est. value
Cincinnati, OH 45206

Jackson Lofts
Renovation
Design
Cincinnati, OH 45202

The Pinecrest Apartments
Renovation - 131,928 SF
Post-Bid
$13,900,000 est. value
Cincinnati, OH 45205

Cincinnati Scholar House
New Construction - 63,300 SF
Construction
$10,200,000 est. value
Cincinnati, OH 45200

LPH Thrives
Renovation - 48,138 SF
Conception
$12,685,463 est. value
Cincinnati, OH 45204

The Red Corner at Madison Park Townhomes
New Construction - 49,920 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Cincinnati, OH 45209

Last Updated 07/05/2019 11:46 AM
Project Title

UFAS Exterior and Interior Modifications at 5038 and 5057 Winneste Avenue

Physical Address View project details and contacts
City, State (County) Cincinnati, OH   (Hamilton County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Work includes but not limited to: Provide ADA sign on exterior wall of unit. Remove/replace existing appliances, cabinets, countertop, kitchen sink, kitchen faucet, rangehood, greaseshield/splash, grab bars (around toilet and shower stall), shower handheld assembly/slide bar, bathroom medicine cabinet/mirror combo, toilet and toilet seat. Remove existing wall tile as required and fur out wall to whereby it's 18" to centerline of toilet flange. Remove/replace bath/toilet accessories (towel bar, toilet tissue holdler, etc.) Insulate all water lines and sanitary piping. Provide and install new lever handle sink faucet. Remove/replace all door hardware where lever handle is required. Remove/replace all toggle switches with rocker style switches. In the following locations: 5038 Winneste Avenue and 5057 Winneste Avenue.
Details
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents