Similar Projects
Reported | 05/13/2022 12:00 AM |
Project Title | Fire Safety |
Physical Address | View project details and contacts |
City, State (County) | Durham, NC (Durham County) |
Category(s) | Single Trades |
Sub-Category(s) | Fire Protection |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs), Construction Start Expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All inspection schedules can start on the last day of each school year through the 1st day of the following school year. A DPS representative will be able to provide the dates for year round and traditional schools on a yearly basis. Documentation - Once each inspection has been completed, written and signed documentation for each item the vendor has been awarded should be placed in the document box located at each site and a copy should be sent to maintenance. Inspection requirements for each site are as follows: 1. Fire Alarm Inspections at each of DPS sites - Yearly 2. Fire door and wall inspections - Yearly Fire door inspections should include conditions of each door, door frames and hardware with the locations and numbering that are located on each frame. Fire Wall inspections should be checked above and below drop ceilings for any penetrations that may need to be sealed. 3. Fire Damper Inspections - Every 4 years including the 1 st year the vendor is awarded the contract. 4. Water Based Suppression systems/ Sprinkler inspections (three quarterly and 1 yearly inspections; Every 3 months) Water Based/ sprinkler inspections should show difference between quarterly and yearly inspection prices. 5. Fire extinguisher inspections and servicing - Yearly Fire Extinguisher documentation should have a computerized documentation of locations of each fire extinguisher per site and shared with maintenance for future reference. 6. Fire role up door drop testing - Yearly a. There are 14 located across the district 7. Kitchen hood and fire suppression testing - Semi- Annually a. There are 108 hoods located across the district) Semi Kitchen hood testing should be scheduled during the summer break and the winter break. A DPS technician will accompany contractor for accessibility of each location. 8. Fire Hydrant inspections at each site a. For each fire hydrant that is located on DPS property. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |