Similar Projects
River's Edge Greenway Trail
Infrastructure
Bidding
Fayetteville, GA 30215

Paving Improvements
Infrastructure
Bidding
Eastman, GA 31023

I-285 WB Ashford Dunwoody Road Ramp Extension
Post-Bid
GA

Construction Management Services for North Oconee River Greenway
Post-Bid
Less than $2,000,000 est. value
Athens, GA 30603

Blakely Gateway Project
Results
$700,000 est. value
Blakely, GA 31723

Jesters Creek Trail Phase III
Results
Morrow, GA 30260

Interchange Court Improvements
Infrastructure
Bidding
Savannah, GA 31405

Lincoln and Washington Street Resurfacing
Post-Bid
Metter, GA 30439

St. Marys FY 2020 LMIG Project
Results
Saint Marys, GA 31558

Asphalt Patch Repair, Concrete Curb, and Sidewalk Replacement
Infrastructure
Bidding
Augusta, GA

Tree Root Damage Repair
Term Contract
Post-Bid
Savannah, GA

Tarboro Fire Station 18 Parking Lot
Results
White Oak, GA 31568

Cooledge Road Sidewalk Project
Infrastructure
Bidding
Tucker, GA 30084

CVS #4740 Partial ADA Project
Renovation
Post-Bid
Smyrna, GA 30080

Ocmulgee Heritage Trail Connector
Results
Macon, GA 31201

Last Updated 03/14/2022 09:09 AM
Project Title

Sidewalk Trip Hazard Removal

Physical Address View project details and contacts
City, State (County) Canton, GA   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $42,959
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Each trip hazard will be removed to a 0” height difference between panels. 2. The entire trip hazard will be removed from one side of the walkway to the other. 3. Only the elevated slab is to be corrected; the opposing slab is to be left pristine. 4. The repaired surface will be flat and smooth with no ridges, peaks or valleys. 5. The repaired surface will be equal to a 1:12 slope as outlined in ADA repair guidelines. 6. A dust containment system will be utilized during the repair process to keep dust to a minimum. 7. All concrete debris removed from the sidewalk will be removed from the site and disposed of by the Contractor. 8. The panel under repair will be swept and blown off. 9. During project production, the County will be supplied with a daily summary of progress at the end of each production day

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents