Last Updated 07/14/2021 03:47 AM
Project Title

Mcluney Street Pavement Improvements

Physical Address View project details and contacts
City, State (County) Fairgrove, MI 48733   (Tuscola County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing storm sewer and pavement improvement on McLuney Street in the Village of Fairgrove of the following quantities: 327 Lin. Ft. 12” RCP Storm Sewer 2 Each 4’ Diameter Manhole/Catch Basin 4 Each 3’ Diameter Catch Basin 2100 Sq. Yd. HMA Base Brushing and Shaping 390 Ton HMA Paving 500 Lin. Ft. Remove and Replace Concrete Curb and Gutter 12 Sq. Yd. Concrete Sidewalk Ramp, 6” 55 Sq. Yd. Concrete Sidewalk, 4”

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents