Similar Projects
Avista Stadium Field Renovations
Renovation
Post-Bid
$200,000 est. value
Spokane Valley, WA 99212

Field Arts and Events Hall
New Construction - 41,000 SF
Pending Verification
$50,000,000 est. value
Port Angeles, WA 98362

Construction of Issaquah High School - Stadium Improvements
Renovation
Post-Bid
$1,100,000 est. value
Issaquah, WA 98027

Fran Rish Stadium Improvements
Renovation
Results
Richland, WA 99352

Yakima County Stadium Improvements
Renovation
Post-Bid
Yakima, WA 98901

FY2022-23 McKenzie Locker Room and HVAC Upgrades Project
New Construction
Bidding
$575,000 est. value
Vancouver, WA 98684

Lumen Field Club Level Restroom Improvement
Renovation
Pending Verification
Seattle, WA 98134

Last Updated 03/14/2022 04:05 PM
Project Title

Olympic Stadium Repairs and Improvements Phase 2

Physical Address View project details and contacts
City, State (County) Hoquiam, WA 98550   (Grays Harbor County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Olympic Stadium is a heavy timber structure completed in 1938 and is listed on the National Register of Historic Places. Primary work consists of: the deteriorated east wall of the stadium will be rebuilt. Shingle siding will be replaced on the south side of the stadium. And new restroom(s) will be added to the main entry area. Provide all labor, materials and equipment required to complete all the Work under a single, lump sum contract for Olympic Stadium Repairs and Improvements, located at 2811 Cherry Street, Hoquiam, WA 98550, as shown on the Drawings and described in the Project Manual. Items of the Work include, but are not limited to: Rebuilding east wall of stadium structure. Replacing existing shingle siding on south and southwest elevations including the addition of plywood sheathing. New shingle siding will be painted. Repair existing fascia panels as required and paint panels as shown. Construction of (1) new restroom as an Additive Alternate and (5) additional restrooms as a separate Additive Alternate, adjacent to the main entry of the stadium. Extension(s) of existing fire suppression system to new rooms and spaces as applicable.

Details

Stadium, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents