Similar Projects
Lane Line Marking
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Inkster, MI 48141

Air Compressor for City of Taylor DPW
Term Contract
Sub-Bidding
Taylor, MI 48180

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Graffiti Removal Contract
Term Contract, Alteration
Post-Bid
MI

Gibson Elementary School Asbestos Abatement
Alteration
Results
Redford Township, MI 48239

Asbestos Abatement
Term Contract
Results
Detroit, MI

Granulated Activated Carbon (GAC) Change-Out
Renovation
Sub-Bidding
$100,000 CJ est. value
Riverview, MI 48193

Asbestos Survey
Term Contract
Post-Bid
Detroit, MI

Abatement Project - Spring and Summer 2022
Alteration
Results
Grosse Pointe, MI

Asbestos Abatement 2023
Term Contract, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Flat Rock, MI 48134

Lead Abatement / Minor Repair Services
Term Contract
Post-Bid
Detroit, MI 48226

Asbestos Abatement at Cambridge HS Prior to Renovations
Alteration
Results
Garden City, MI 48135

Gateway Theater Complex -Asbestos abatement at the Hilberry Theatre / Gretchen Valade Building
Alteration
Post-Bid
Detroit, MI

Asbestos Abatement At Edison, Hamilton & Schweitzer Elementary School
Alteration
Results
Westland, MI

Owen Intermediate School Asbestos Abatement
Alteration
Post-Bid
Belleville, MI 48111

Last Updated 11/17/2022 02:25 PM
Project Title

Demolition Services

Physical Address View project details and contacts
City, State (County) Flat Rock, MI 48134   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals for Prime Contractors are invited for the following construction work: (#22201) Building Demolition and Related Work at Flat Rock Community Schools "Former" Administration Building. Proposals are to be separate per project and complete, including all trades (Sub-Contractors and Suppliers), as the successful Contractor will be considered a Prime Contractor entering into a direct contract with the Owner. The Architect's Project Manager, will be at this meeting to collect proof of qualification documentation, clarify the bidding procedures, scope of work, identify any items of concern and answer questions from the Bidders for their preparation and submission of representative competitive bids. It is the Contractor's responsibility to assure the Architect has been furnished all necessary pre-approval information as listed in Instructions to bidders Art. 19 at or prior to this meeting. The Architect will assemble an official list of approved bidders two days after the mandatory pre-bid meeting. The list will be limited to Contractors who attend the entire pre-bid meeting, have signed an official attendance list, have checked out official plans and specifications from the Architect, and meet the minimum Contractor qualifications as listed in the Instructions to Bidders. Bids submitted by Contractors who are not on the approved bidders list or do not meet these pre-bid requirements will not be opened and will be returned to the bidder. The proposal must be accompanied by a certified check or bid bond by an approved surety company in the amount of five percent (5%) of the proposal submitted payable to the Owner. Proposals shall remain firm for a period of fortyfive (45) days after official opening of bids. The successful Contractor will be required to furnish performance, labor and material bonds, each in the full amount of the proposal if payments are issued prior to completion and/or the contract is $50,000.00 or more. All bidders must provide disclosure in compliance with MCL 380.1267 and attach this information to the bid. The bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the Owner or the employee of the bidder and any member of the board, intermediate school board, or board of directors or the superintendent of the school district, intermediate superintendent of the intermediate school district, or chief executive officer of the public school academy. The District shall not accept a bid that does not include this sworn and notarized disclosure statement. All bidders must provide a sworn and notarized statement in compliance with Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 and attach this information to the bid. The District shall not accept a bid that does not include this sworn and notarized statement. The Owner reserves the right to waive any irregularities, reject any or all bids, or accept the bid that in the opinion of the Owner, will serve the best interests of the Owner.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents