Similar Projects
Last Updated | 08/14/2023 03:05 AM |
Project Title | Community Center Improvements |
Physical Address | View project details and contacts |
City, State (County) | Fountain Hills, AZ 85268 (Maricopa County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $270,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Existing outside space to be converted into an enclosed conditioned storage space which includes new non-rated exterior wall, adding a new door that will be accessed from the exterior and adding openings to existing exterior screen wall. In addition to providing needed storage space, recently completed flatwork is expected to eliminate water ponding and intrusion into the facility due to the original faulty grade. Permitting, Civil work, concrete and exterior screen wall demolition, grading and flatwork is complete. Project to include labor and materials to construct improvements, including: Fire alarm and sprinkler modifications to accommodate newly created space. Close and finish exterior screen wall cuts to match adjacent. Close and finish removed gate posts. Fill and finish to match adjacent. Existing canopy to remain, no work required. See Engineers drawings for fixtures and devices. Install new insulated door, hardware, frame and card reader. New walls, infill to match existing width and finish of adjacent walls. Infill openings to match adjacent construction and refinish entire wall for both interior and exterior sides. Existing ceiling to be repaired and repainted. Acoustical ceiling grid and tile to be replaced as needed. Electrical work/modifications as necessary to accommodate new equipment requirements and lighting specifications. Mechanical work necessary for installation of HVAC specified in drawings. Controls will be integrated with existing BMS system. System shall be tested and balanced. Roof work to accommodate specified penetrations and equipment mounting. Target Town Council Award Date: September 4, 2023 Anticipated Agreement Start Date: September 11, 2023 Questions are due in 21 days. Question Deadline Aug 10, 2023 |
||
Details | 391 SF.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |