Similar Projects
Vacuum Excavating and Utility Location
Infrastructure
Bidding
Los Angeles, CA

Repair and Installation of Wet and Dry Utilities at Los Angeles International Airport and Van Nuys Airport
Alteration
Bidding
$750,000 est. value
Los Angeles, CA 91406

S208--Irrigation System Repair
Alteration
Post-Bid
Los Angeles, CA 90073

Construction of Van Ness Water Wells Transmission Main
Infrastructure
Post-Bid
$12,000,000 to $13,000,000 est. value
Torrance, CA 90503

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Los Nietos, Line D, Sorensen Lateral
Infrastructure
Results
$500,000 to $775,000 est. value
Los Nietos, CA 90610

Advanced Metering Infrastructure (AMI) System
Infrastructure
Bidding
$540,000 est. value
Santa Monica, CA

Earl Schmidt Filtration Plant (ESFP) Washwater Return and Sludge Systems
Term Contract, Alteration
Post-Bid
Santa Clarita, CA

Cast Iron Main Replacement
Infrastructure
Results
$2,745,430 est. value
Long Beach, CA 90899

Clamps, Pipe Repair
Infrastructure
Bidding
$30,000 est. value
Los Angeles, CA

691 Water Valve Maintenance & Repair
Term Contract
Post-Bid
Los Angeles, CA

Groundwater Pre-Filter and Carbon Filtration Removal and Replacement and Repair Services
Term Contract
Results
Paramount, South Gate, CA 90280

Valves, Globe, with Metering Package
Infrastructure
Bidding
Los Angeles, CA

Orange County Feeder and Extension Relining - Reach 3
Term Contract
Post-Bid
Los Angeles, CA

San Bernardino County Region - West, Right of Way Infrastructure Protection Program, Stage 1
Infrastructure
Results
$600,000 to $700,000 est. value
Los Angeles, CA

Reported 05/27/2022 12:00 AM
Project Title

Backflow Prevention Device Testing, Repair and Replacement

Physical Address View project details and contacts
City, State (County) Palmdale, CA   (Los Angeles County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $240,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The successful Contractor shall provide all labor, materials, equipment, transportation, and services required to inspect, test, repair, and replace backflow prevention devices. The contractor shall report on all backflow prevention devices identified by the City of Palmdale. All work shall be in accordance with USC, Foundation for Cross-Connection Control and Hydraulic Research Prevention Assembly Field Test Procedures, as described in the current edition of the USC-FCCHD Manual for Cross-Connection Control. Backflow Prevention Device Testing and Certification is required on an annual basis. Currently, there are approximately 600 individual backflow prevention devices that require testing. Most certification notices will be provided to the Contractor in packets of 20 or more devices to test at one time, with single test notices occurring infrequently throughout the year. The nature of these certifications requires a timely response from the Backflow Testing Contractor to ensure certifications are completed and submitted by the due date specified by each regulatory agency. It is anticipated that various devices will require repairs to pass the certification tests. The Contractor will notify the Landscape Superintendent or appointed designee of necessary repairs to devices larger than 2" and gain authorization prior to performing the necessary work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents