Similar Projects
Water, Sanitary Sewer, Drainage Facilities to Serve Caldwell Ranch Section 7
Infrastructure
Bidding

Waterline Replacement Project
Post-Bid
Less than $186,000 est. value
Eastland, TX 76448

Black and Galvanized Pipe Fittings
Post-Bid
Corpus Christi, TX 78401

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Services
Term Contract
Post-Bid
Cuero, TX 77954

Water Improvement Project 915 to 1301 Grinnell Drive
Results
$531,128 est. value
Richardson, TX 75080

Travis Ranch Phase 2K Utility Improvements
Post-Bid
Dallas, TX

2020 CMP (Corrugated Metal Pipe) Rehabilitation Toc Project
Results
$4,000,000 est. value
San Antonio, TX 78205

Automated Meter Reading/Advanced Metering Infrastructure System
Infrastructure
Post-Bid
Blue Ridge, TX

Wastewater Facilities Safety and Security Improvements Project
Results
$6,645,900 est. value
Dallas, TX 75201

2018 CIP Year 2 Contract 17
Results
$6,500,000 est. value
Fort Worth, TX 76102

Large Size Meter Replacement
Results
Less than $200,000 est. value
Farmers Branch, TX 75234

Meadowlark 16-Inch Water Main Replacement Project
Results
Less than $1,117,424 est. value
San Antonio, TX 78210

Elgin FM 1704 Wastewater Extension
Results
$2,000,000 est. value
Elgin, TX 78621

Last Updated 08/07/2021 03:01 AM
Project Title

Alliance Regional Water Authority Phase 1B Treated Pipeline Segment A

Physical Address View project details and contacts
City, State (County) TX   (Caldwell County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $35,000,000 to $45,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of construction of approximately 89,000 LF of 42-/48-inch water line and appurtenances. The Work also includes approximately 1,500 LF of trenchless construction, including the crossing of Plum Creek. The Work also includes a parallel fiber optic installation. In addition to the Segment A alignment, the parallel fiber installation also includes ARWA’s raw water infrastructure, the Water treatment Plant site, the Segment B pipeline, and the Booster Pump Station site, totaling approximately 158,000 LF. The locations of all fiber optic work. Treated Pipeline Segment A begins at the future ARWA Water Treatment Plant near SH-304 and Wolf Run Rd (CR 156). The project continues west crossing multiple county roads, state highways, and Plum Creek. The project includes a connection to a future Lockhart Delivery Point and terminates near FM 1322, where Segment B begins.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents