Similar Projects
Barton Village Amenity Center
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Lebanon, TN 37090

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Cedars of Lebanon Parking lots
Infrastructure
Post-Bid
$50,000 est. value
Lebanon, TN 37090

SWC 504 Winter Road Maintenance
Term Contract
Post-Bid
$1,971,195 est. value

The Sweeping and Drain Cleaning Various Interstate and State Routes
Infrastructure
Results

Drain Cleaning on Various Interstate and State Routes
Infrastructure
Results

Zaxby's / Lebanon
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Lebanon, TN 37087

Zaxby's / Lebanon
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Lebanon, TN 37087

Whataburger - TN 109 / Lebanon
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Lebanon, TN 37090

Whataburger - TN 109 / Lebanon
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Lebanon, TN 37090

Traffic Signal Installation Hunters Point Pike (State Route 10/US 231 North) at Torrey Pines Lane/hunters Village Drive
Infrastructure
Bidding
$400,000 CJ est. value
Lebanon, TN 37087

Providence Parkway Intersection Improvements
Infrastructure
Post-Bid
Mount Juliet, TN 37122

The On-Call Concrete Pavement Repair at Various Locations on Various Interstate and State Routes
Infrastructure
Results

Cedar Farm Village
New Construction, Infrastructure
Pending Verification
$120,000,000 CJ est. value
Lebanon, TN 37087

Last Updated 01/04/2023 10:13 AM
Project Title

South Greenhill Road / Willoughby Station Boulevard Roundabout

Physical Address View project details and contacts
City, State (County) Mt Juliet, TN 37122   (Wilson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of the furnishing of all materials, equipment, and labor for the construction of a roundabout at the intersection of S. Greenhill Road and Willoughby Station Boulevard. The improvements include a single lane roundabout, sidewalks with curb ramps, shared use path, curb & gutter, storm drainage, rock excavation, cold planing, paving, pavement markings and striping, signing, and landscaping and irrigation. Project length is 0.404 mile.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents