Similar Projects
Bio - Chemistry Chillers Replacement HVAC Controls - Ohio University
Renovation, Alteration
Conception
$2,000,000 est. value
Athens, OH 45701

Cassidy Theater A/C Rehab
Renovation
Sub-Bidding
$167,000 CJ est. value
Cleveland, OH 44130

HVAC Improvement Program
Renovation
Sub-Bidding
$2,056,041 CJ est. value
Worthington, OH 43201

Elizabeth M Anderson Hall and Sunie S. Green Hall HVAC Replacement
Post-Bid
$1,199,000 est. value
Wilberforce, OH

J041--Quarterly Maintenance (4 York Chillers)
Term Contract
Post-Bid
Columbus, OH 43219

Air Handler Maintenance
Results
OH

Air Handler Maintenance
Results
OH

HVAC Repair/Replacement Program
Renovation
Sub-Bidding
Hamilton, OH 45011

HVAC Replacements FY 2020 Project
Alteration
Post-Bid
$3,200,000 est. value
Columbus, OH 43210

Ohio National Guard Controlled Humidity Protection
Results
$50,000 to $80,000 est. value
Columbus, OH 43235

Z1da--(Const) Replace Fan Coil Units 539-21-109
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Cincinnati, OH 45220

Y1da--Add AHU Metering Louis Stokes VAMC
Results
$1,000,000 to $5,000,000 est. value
Cleveland, OH 44106

HVAC and Mechanical Preventative Maintenance
Term Contract
Post-Bid
Columbus, OH

Olentangy Shanahan Middle School Admin Offices HVAC Modifications
Alteration
Results
$89,384 est. value
Lewis Center, OH 43035

Chiller Maintenance
Term Contract
Post-Bid
Wright Patterson Air Force Base, OH

Last Updated 05/01/2023 09:39 AM
Project Title

Shriver Center Cooler/Freezer Upgrade

Physical Address View project details and contacts
City, State (County) Oxford, OH 45056   (Butler County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $76,902 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of February 17, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Shriver Center Cooler/Freezer Upgrade Please email copy your submittal to vanwind3@miamioh.edu after you submit your quote via the Ionwave tool. 1. This request for proposals is for the selection of a vendor/provider to the University for products and/or services in accordance with the detailed specifications and requirements which follow. In addition, specific questions regarding the RFQ should be submitted through the portal. Responses to the vendors questions will be posted through the portal as well. 3. A list of exceptions, if any, describing any exceptions or deviations from the standards specified must accompany each item or service requested. Unless an exception to the specifications is clearly stated within your bid submission, the proposal will be expected to meet or exceed each specification, term, and condition. Any deviations from the minimum specifications will be evaluated by the end users. All proposals must be signed by an authorized agent of the seller. Prices, discounts or other financial considerations that address the requirements of this proposal described in the technical detailed section shall be fully enumerated in the response. 4. It is the responsibility of the respondent to ensure that all required documentation, as enumerated above, arrives on time and at the designated location. Any submissions received after the stated date and time, or those that do not contain the required information as enumerated above, or the correct number of copies, will be considered incomplete and unresponsive, and will be disqualified. 5. Award will be based on price and terms, delivery/availability, quality and durability, ease of use and suitability of equipment for the University's intended use, cost of installation, and judged reliability. References may be questioned in depth in an effort to determine satisfaction with operational performance and service. The proposal which offers the best combination of price, equipment options, delivery time, quality, serviceability, and reliability, in the opinion of Miami University, will be selected. Question Cuttoff Date & Time 1/23/2023 04:00:00 PM (ET)

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents