Similar Projects
Last Updated | 11/03/2021 09:20 AM |
Project Title | Riverside Park Site Improvements Phase II |
Physical Address | View project details and contacts |
City, State (County) | Sunderland, MA 01375 (Franklin County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $43,573 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of improvements to Sunderland Riverside Park and Boat Ramp. ? The boat ramp work consists of the addition of a new 4 foot wide asphalt sidewalk, 1 foot rip rap gutter, asphalt berm, associated grading, erosion control and plantings, along the boat ramp drive. All work will take place within FEMA Flood Area and Riverfront Area, this part of the project includes an order of conditions with Sunderland Conservation Commission. ? The Park work consists of (3) separate asphalt areas, tree plantings, picnic tables and Native Vegetation Mitigation Area o Two new asphalt walkways leading to the existing dugouts. o Repave the asphalt walkway and pad leading to the existing bathroom building. o (3) Tree planting and picnic tables at picnic area. o Add alternate, Native Vegetation Mitigation Area 2. And other site improvements required for or incidental to the construction of the Site Improvements |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |