Similar Projects
Construction of the Sevier SSD 1 - Box Culvert Rehabilitation Convulsion Canyon and Salina Creek
Post-Bid
Less than $245,000 est. value
Richfield, UT

White Rock Debris Basin Project
Post-Bid
UT

Ballard City Property Drainage Improvements
Results
Less than $51,000 est. value
Ballard, UT

Specialized Precast Concrete Box Culvert
Results

Ashley Upper and Highline Canals Rehabilitation Project/CMAR
Construction
Less than $34,000 est. value
UT

Construction of the Vibration Dampening Trench
Post-Bid
Smithfield, UT

Prince of Wales Reclamation
Results
Less than $50,000 est. value
UT

Reservoir Control Valve Project
Post-Bid
Kaysville, UT

Construction of The Virgin River Stream Restoration Project
Results
Less than $1,116,310 est. value
Washington, UT

Goose Creek Fire Riparian and Stream Restoration
Post-Bid
Salt Lake City, UT

City Drain Crossing at Hunter Stables
Results
Salt Lake City, UT

Mill Meadow Dam Rehabilitation Project
Post-Bid
Loa, UT

Iowa String Box Culverts
Results
$500,000 to $1,500,000 est. value
UT

Koosharem Town 2018 Chip Seal and Drainage Project
Post-Bid
Koosharem, UT 84744

Mountain View Elementary Drainage
Results
$200,000 to $300,000 est. value
Layton, UT

Last Updated 02/25/2019 10:48 AM
Project Title

Construction of the Carbon County - 2019 Emergency Watershed Protection

Physical Address View project details and contacts
City, State (County) UT   (Carbon County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $83,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Construction of the Carbon County 2019 Emergency Watershed Protection Schedules 1, 2, 3, which includes, earthwork, clearing and grubbing, remove culvert, culvert installation, concrete culvert headwalls, concrete canal structures, canal gate installations, riprap, grouted riprap, gabion baskets, fencing, and related work.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents