Similar Projects
CPU Buildings Seismic & Structural Improvements
Renovation
Conception
Vancouver, WA

Waterfront East
Demolition, LEED Certification, New Construction, Infrastructure - 300,000 SF
Conception
$100,900,000 CJ est. value
Vancouver, WA 98661

Fruit Valley Modernization
Build-out, Renovation, Infrastructure
Design
$4,754,309 CJ est. value
Vancouver, WA 98660

Westside Wastewater Treatment Facility (WWTF) Backflow Prevention Improvements
Infrastructure
Design
$95,500 CJ est. value
Vancouver, WA 98660

2023 Manhole Coating Project Restoration And Replacement Program
Infrastructure
Bidding
$20,000 CJ est. value
Vancouver, WA 98660

Request for Qualifications for Construction Manager / General Contractor Services Vancouver New Construction Multi-Family Project
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Vancouver, WA 98684

Department of Social and Health Services Residential Treatment Facility Bid Package 1 and 2
Infrastructure
Sub-Bidding
$600,000 CJ est. value
Vancouver, WA 98686

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

GAOA Alt/Repair Construction Services MATOC
Renovation
Results

Architectural Services for High School Addition
New Construction, Addition - 15,000 SF
Results
Ridgefield, WA 98642

119th Cottages
New Construction, Infrastructure
Pending Verification
$18,400,000 CJ est. value
Vancouver, WA 98686

Villagio Mixed-Use Development
New Construction, Infrastructure - 27,940 SF
Pending Verification
$15,000,000 CJ est. value
Vancouver, WA 98662

NE 90th Circle Apartments
New Construction, Infrastructure
Conception
$27,500,000 CJ est. value
Vancouver, WA 98665

SR 500 / I-5 to NE 112th Ave Vicinity - Replace Fiber
Infrastructure
Design
$553,000 CJ est. value
Vancouver, WA 98682

Last Updated 12/08/2022 09:02 PM
Project Title

Replacement of the Current Evergreen School District Transportation Facility

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98682   (Clark County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $17,500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the current Evergreen School District Transportation Facility. The new Transportation Center will expand into the old Burton Elementary site and a new 26,000 SF building will be constructed under this project. the new building will be a single-story structural consisting of an 11,000 SF office and a 15,000 SF shop maintenance facility. The office will house administrative staff, driver training, dispatch, routing, drivers support spaces, staff and driver breakrooms, restroom and locker room facilities, and flexible meeting/conferencing spaces. The shop base bid will consist of 6 large repair/work bays, locker rooms, fluids room, compressor room, welding area, tire service areas, parts and receiving, various storage spaces, and numerous workbenches and specialized equipment components. The abandoned Burton Elementary buildings covered play structure, and portables will be demolished as a part of this project scope.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents