Similar Projects
North Choctaw Road, East 66 Highway - 1100 Feet north of the intersection of N Choctaw Road and East 66 Highway (Ward 7) - City of Oklahoma City
New Construction, Demolition, Infrastructure
Conception
$415,000 est. value
Oklahoma City, OK 73054

BSSC Resurfacing of North Broadway - North Broadway Avenue from Dean A McGee Avenue to North West 10th Street (Ward 6) - City of Oklahoma City
Infrastructure
Conception
$1,600,000 est. value
Oklahoma City, OK 73195

Arterial Street Resurfacing Unit Price Contract
Infrastructure
Bidding
$8,000,000 est. value
Oklahoma City, OK

Residential Local and Collector Street Resurfacing Unit Price Contract
Infrastructure
Bidding
$8,000,000 est. value
Oklahoma City, OK

Pavement Extension, AMP 101, Will Rogers Courts
Post-Bid
Oklahoma City, OK 73108

Street Repair Unit Price Contract
Infrastructure
Post-Bid
$3,000,000 est. value
Oklahoma City, OK

Thomas P Stafford Northeast Plaza Pavement for OCAT
Results
$243,447 est. value
Oklahoma City, OK

University Boulevard Street Improvements
Infrastructure
Results
$2,970,000 est. value
Durant, OK

Bike Lanes: On Nw Grand Boulevard And N. Independence Ave. To Connect To The Bert Cooper Trails
Alteration
Conception
$1,250,000 est. value
Oklahoma City, OK 73112

Access Road Repair at JMWE Airport
Term Contract
Post-Bid
Oklahoma City, OK 73169

Residential Resurfacing
Infrastructure
Results
$3,970,000 est. value
Oklahoma City, OK

Street Enhancements: NW 10th Street from Rockwell Avenue to Council Road - City of Oklahoma City
Alteration
Conception
Oklahoma City, OK 73195

Construction of Stephenson Park and 4th Street Streetscape
Infrastructure
Post-Bid
$2,000,000 est. value
Edmond, OK

Arterial Street Resurfacing Unit Price Contract
Infrastructure
Results
$2,700,000 est. value
Oklahoma City, OK

Oklahoma River North Trail Paving - City of Oklahoma City
Infrastructure
Conception
$864,226 est. value
Oklahoma City, OK

Reported 06/21/2022 01:00 PM
Project Title

WRWA Terminal Access Road - Will Rogers World Airport (Ward 3) - City of Oklahoma City

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73159   (Oklahoma County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $1,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, paving and renovation of a mixed-use development in Oklahoma City, Oklahoma. Conceptual plans call for the renovation of a transportation facility; for site work for a road / highway; and for paving for a road / highway. Will Rogers World Airport - Rehabilitate the terminal entrance and exit road along with adjacent intersecting roads. Estimated annual operating cost is $0. The project is included in the City of Oklahoma City's FY 2023 Capital Improvement Program (CIP). As of June 20, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Airline/Passenger Terminal, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents