Similar Projects
FY20-1 Maintenance Project
Bidding
$4,100,000 est. value
Austin, TX 78750

IH0035 - Asphalt
Infrastructure
Bidding
$168,000 est. value
TX

El Malino Dr. and Bellemeade Blvd. Pavement Rehabilitation
Post-Bid
Less than $318,249 est. value
Pflugerville, TX 78660

Caughfield Phase Ten Paving, Drainage, Water Wastewater Improvements
Post-Bid
Austin, TX 78728

Southern Region Disaster Recovery Support BPA
Results

Miscellaneous Streets Slurry Seal and Fog Seal IDIQ(CIP )
Term Contract
Results
$8,000,000 est. value
Austin, TX

IH0035 - Flexible Base
Infrastructure
Bidding
$845,000 est. value
TX

Estates at North-Gate Phase 1
Post-Bid
Austin, TX 78728

Sun Chase South Sections 6 and 7 - Streets, Drainage, Water, Wastewater and Erosion Control Improvements
Results
Austin, TX 73301

2021 Street Maintenance Program - High Density Mineral Bond
Infrastructure
Bidding
Round Rock, TX

Park Side on the River Phase 1A
Post-Bid
Austin, TX

Performance Based Contract
Results
Less than $27,469,730 est. value
TX

Bryson Phase 2, Section 3, Public Improvement Construction Plans Water, Wastewater, Drainage and Paving Improvements
Post-Bid
Leander, TX 78641

System-Wide Performance Based Maintenance Contract
Term Contract
Results
Less than $51,426,072 est. value
Austin, TX 78705

Balcones Asphalt Paving
Post-Bid
$35,000 to $45,000 est. value

Last Updated 06/04/2021 05:40 AM
Project Title

RM 3238 - Rehabilitate Existing Roadway

Physical Address View project details and contacts
City, State (County) TX   (Travis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,310,438
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing RowDollarsAnd CentsSta 346.500 1 104 6009 Removing Conc (Riprap)DollarsAnd CentsSy 3,545.000 2 104 6017 Removing Conc (Driveways)DollarsAnd CentsSy 461.000 3 104 6054 Removing Concrete(Mow Strip)DollarsAnd CentsLf 5,782.000 4 110 6001 Excavation (Roadway)DollarsAnd CentsCy 74,654.000 5 132 6003 Embankment (Final)(Ord Comp)(Ty B)DollarsAnd CentsCy 27,680.000 6 160 6003 Furnishing And Placing Topsoil (4")DollarsAnd CentsSy 145,421.000 7 162 6008 Roll SoddingDollarsAnd CentsSy 145,421.000 8 164 6009 Broadcast Seed (Temp) (Warm)DollarsAnd CentsSy 145,421.000 9 164 6011 Broadcast Seed (Temp) (Cool)DollarsAnd CentsSy 145,421.000 10 168 6001 Vegetative WateringDollarsAnd CentsMg 2,110.000 11 169 6001 Soil Retention Blankets (Cl 1) (Ty A)DollarsAnd CentsSy 145,421.000 12 247 6366 003 Fl Bs (Cmp In Plc)(Ty A Gr 5)(Fnal Pos)DollarsAnd CentsCy 29,320.000 13 310 6001 Prime Coat (Multi Option)DollarsAnd CentsGal 14,944.000 14347 6001 002 Tom (Asphalt) Pg 76-22DollarsAnd CentsTon 619.000 15 347 6002 002 Tom-C (Aggregate) Sac-ADollarsAnd CentsTon 9,335.000 16 354 6188 Plane Asph Conc Pav(Micromlling)(1")DollarsAnd CentsSy 108,474.000 17 400 6001 Struct ExcavDollarsAnd CentsCy 4,458.200 18 400 6005 Cem Stabil BkflDollarsAnd CentsCy 2,705.700 19 400 6008 Cut & Restore Asph PavingDollarsAnd CentsSy 501.700 20 401 6001 Flowable BackfillDollarsAnd CentsCy 707.200 21 402 6001 Trench Excavation ProtectionDollarsAnd CentsLf 1,351.000 22 403 6001 Temporary Spl ShoringDollarsAnd CentsSf 899.100 23 432 6002 Riprap (Conc)(5 In)DollarsAnd CentsCy 2,005.600 24 432 6029 Riprap (Stone Common)(Grout)(8 In)DollarsAnd CentsCy 229.900 25 432 6045 Riprap (Mow Strip)(4 In)DollarsAnd CentsCy 503.400 26 460 6002 Cmp (Gal Stl 18 In)DollarsAnd CentsLf 1,837.000 27 460 6003 Cmp (Gal Stl 24 In)DollarsAnd CentsLf 414.000 28 462 6004 002 Conc Box Culv (4 Ft X 3 Ft)DollarsAnd CentsLf 202.000 29 462 6005 002 Conc Box Culv (4 Ft X 4 Ft)DollarsAnd CentsLf 88.000 30 462 6008 002 Conc Box Culv (5 Ft X 4 Ft)DollarsAnd CentsLf 328.000 31 462 6011 002 Conc Box Culv (6 Ft X 4 Ft)DollarsAnd CentsLf 76.000 32 462 6012 002 Conc Box Culv (6 Ft X 5 Ft)DollarsAnd CentsLf 96.000 33 462 6017 002 Conc Box Culv (7 Ft X 6 Ft)DollarsAnd CentsLf 264.000 34 462 6024 002 Conc Box Culv (9 Ft X 5 Ft)DollarsAnd CentsLf 94.000 35 462 6034 002 Conc Box Culv (10 Ft X 10 Ft)DollarsAnd CentsLf 123.000 36 464 6005 001 Rc Pipe (Cl Iii)(24 In)DollarsAnd CentsLf 507.000 37 464 6018 001 Rc Pipe (Cl Iv)(24 In)DollarsAnd CentsLf 150.000 38 464 6019 001 Rc Pipe (Cl Iv)(30 In)DollarsAnd CentsLf 316.000 39 464 6020 001 Rc Pipe (Cl Iv)(36 In)DollarsAnd CentsLf 356.000 40 464 6021 001 Rc Pipe (Cl Iv)(42 In)DollarsAnd CentsLf 72.000 41 464 6083 001 Rc Pipe (Ellip)(Cl Iii)(Des 5)DollarsAnd CentsLf 68.000 42 466 6097 Headwall (Ch - Pw - 0) (Dia= 24 In)DollarsAnd CentsEa 2.000 43 466 6099 Headwall (Ch - Pw - 0) (Dia= 30 In)DollarsAnd CentsEa 1.000 44 466 6101 Headwall (Ch - Pw - 0) (Dia= 36 In)DollarsAnd CentsEa 1.000 45 466 6102 Headwall (Ch - Pw - 0) (Dia= 42 In)DollarsAnd CentsEa 1.000 46 466 6112 Headwall (Ch - Pw - A - 0) (Des= 5)DollarsAnd CentsEa 2.000 47 466 6130 Headwall (Ch - Pw - S) (Dia= 24 In)DollarsAnd CentsEa 2.000 48 466 6132 Headwall (Ch - Pw - S) (Dia= 30 In)DollarsAnd CentsEa 4.000 49 466 6134 Headwall (Ch - Pw - S) (Dia= 36 In)DollarsAnd CentsEa 4.000 50 466 6171 Wingwall (Pw - 1) (Hw=10 Ft)DollarsAnd CentsEa 2.000 51 466 6172 Wingwall (Pw - 1) (Hw=11 Ft)DollarsAnd CentsEa 1.000 52 466 6176 Wingwall (Pw - 1) (Hw=15 Ft)DollarsAnd CentsEa 2.000 53 466 6180 Wingwall (Pw - 1) (Hw=5 Ft)DollarsAnd CentsEa 1.000 54 466 6181 Wingwall (Pw - 1) (Hw=6 Ft)DollarsAnd CentsEa 3.000 55 466 6182 Wingwall (Pw - 1) (Hw=7 Ft)DollarsAnd CentsEa 1.000 56 466 6183 Wingwall (Pw - 1) (Hw=8 Ft)DollarsAnd CentsEa 7.000 57 466 6184 Wingwall (Pw - 1) (Hw=9 Ft)DollarsAnd CentsEa 3.000 58 466 6219 Headwall (Ch-Pw-0) (Dia=48 In) (Mod)DollarsAnd CentsEa 1.000 59 466 6233 Headwall (Ch-Pw-0)(Dia = 30 In)(Mod)DollarsAnd CentsEa 3.000 60 466 6246 Headwall (Ch - Pw - 0)(Dia=36 In)(Mod)DollarsAnd CentsEa 3.000 61 466 6258 Headwall (Ch-Pw-0)(Dia=42 In)(Mod)DollarsAnd CentsEa 1.000 62 467 6348 Set (Ty Ii) (18 In) (Cmp) (6: 1) (P)DollarsAnd CentsEa 92.000 63 467 6363 Set (Ty Ii) (18 In) (Rcp) (6: 1) (P)DollarsAnd CentsEa 8.000 64 467 6380 Set (Ty Ii) (24 In) (Cmp) (6: 1) (P)DollarsAnd CentsEa 14.000 65 467 6395 Set (Ty Ii) (24 In) (Rcp) (6: 1) (P)DollarsAnd CentsEa 20.000 66 496 6004 Remov Str (Set)DollarsAnd CentsEa 132.000 67 496 6006 Remov Str (Headwall)DollarsAnd CentsEa 9.000 68 496 6007 Remov Str (Pipe)DollarsAnd CentsLf 3,904.000 69 500 6001 MobilizationDollarsAnd CentsLs 1.000 70 502 6001 008 Barricades, Signs And Traffic HandlingDollarsAnd CentsMo 18.000 71 506 6002 005 Rock Filter Dams (Install) (Ty 2)DollarsAnd CentsLf 740.000 72 506 6011 005 Rock Filter Dams (Remove)DollarsAnd CentsLf 740.000 73 506 6038 005 Temp Sedmt Cont Fence (Install)DollarsAnd CentsLf 12,902.000 74 506 6039 005 Temp Sedmt Cont Fence (Remove)DollarsAnd CentsLf 12,902.000 75 508 6001 Constructing DetoursDollarsAnd CentsSy 2,886.000 76 512 6104 Pctb Fur&Instl(F-Shape Or SnglSlp)Ty1DollarsAnd CentsLf 500.000 77 512 6105 Pctb Move&Reset(F-Shape Or SnglSlpty1DollarsAnd CentsLf 21,000.000 78 512 6106 Port Ctb Remove(F-Shape Or SnglSlp)Ty1DollarsAnd CentsLf 500.000 79 529 6008 Conc Curb & Gutter (Ty Ii)DollarsAnd CentsLf 340.000 80 530 6004 Driveways (Conc)DollarsAnd CentsSy 375.000 81 530 6005 Driveways (Acp)DollarsAnd CentsSy 8,521.000 82 540 6001 001 Mtl W-Beam Gd Fen (Tim Post)DollarsAnd CentsLf 8,462.000 83 540 6002 001 Mtl W-Beam Gd Fen (Steel Post)DollarsAnd CentsLf 300.000 84 540 6016 001 Downstream Anchor Terminal SectionDollarsAnd CentsEa 3.000 85 542 6001 Remove Metal Beam Guard FenceDollarsAnd CentsLf 5,582.000 86 544 6001 Guardrail End Treatment (Install)DollarsAnd CentsEa 52.000 87 545 6003 Crash Cush Atten (Move & Reset)DollarsAnd CentsEa 42.000 88 545 6005 Crash Cush Atten (Remove)DollarsAnd CentsEa 2.000 89 545 6019 Crash Cush Atten (Instl)(S)(N)(Tl3)DollarsAnd CentsEa 2.000 90 552 6001 Wire Fence (Ty A)DollarsAnd CentsLf 100.000 91 552 6003 Wire Fence (Ty C)DollarsAnd CentsLf 100.000 92 552 6005 Gate (Ty 1)DollarsAnd CentsEa 5.000 93 560 6001 Mailbox Install-S (Twg-Post) Ty 1DollarsAnd CentsEa 5.000 94 560 6002 Mailbox Install-D (Twg-Post) Ty 1DollarsAnd CentsEa 1.000 95 560 6003 Mailbox Install-M (Twg-Post) Ty 1DollarsAnd CentsEa 34.000 96 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(P)DollarsAnd CentsEa 84.000 97 644 6002 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(Pbm)DollarsAnd CentsEa 12.000 98 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(T)DollarsAnd CentsEa 24.000 99 644 6076 Remove Sm Rd Sn Sup&AmDollarsAnd CentsEa 119.000 100 658 6060 Remove Delin & Object Marker AssmsDollarsAnd CentsEa 45.000 101 658 6062 Instl Del Assm (D-Sw)Sz 1(Brf)Gf2(Bi)DollarsAnd CentsEa 109.000 102 658 6073 Instl Om Assm (Om-2y)(Wc)Gnd(Bi)DollarsAnd CentsEa 46.000 103 662 6004 Wk Zn Pav Mrk Non-Remov (W)4"(Sld)DollarsAnd CentsLf 71,324.000 104 662 6034 Wk Zn Pav Mrk Non-Remov (Y)4"(Sld)DollarsAnd CentsLf 45,824.000 105 662 6061 Wk Zn Pav Mrk Remov (W)4"(Dot)DollarsAnd CentsLf 2,320.000 106 662 6063 Wk Zn Pav Mrk Remov (W)4"(Sld)DollarsAnd CentsLf 66,300.000 107 662 6094 Wk Zn Pav Mrk Remov (Y)4"(Dot)DollarsAnd CentsLf 4,640.000 108 662 6095 Wk Zn Pav Mrk Remov (Y)4"(Sld)DollarsAnd CentsLf 66,300.000 109 666 6005 007 Refl Pav Mrk Ty I (W)4"(Dot)(090mil)DollarsAnd CentsLf 989.000 110 666 6035 007 Refl Pav Mrk Ty I (W)8"(Sld)(090mil)DollarsAnd CentsLf 126.000 111 666 6047 007 Refl Pav Mrk Ty I (W)24"(Sld)(090mil)DollarsAnd CentsLf 36.000 112 666 6168 007 Refl Pav Mrk Ty Ii (W) 4" (Dot)DollarsAnd CentsLf 989.000 113 666 6170 007 Refl Pav Mrk Ty Ii (W) 4" (Sld)DollarsAnd CentsLf 65,726.000 114 666 6178 007 Refl Pav Mrk Ty Ii (W) 8" (Sld)DollarsAnd CentsLf 126.000 115 666 6182 007 Refl Pav Mrk Ty Ii (W) 24" (Sld)DollarsAnd CentsLf 36.000 116 666 6184 007 Refl Pav Mrk Ty Ii (W) (Arrow)DollarsAnd CentsEa 20.000 117 666 6205 007 Refl Pav Mrk Ty Ii (Y) 4" (Brk)DollarsAnd CentsLf 15,390.000 118 666 6207 007 Refl Pav Mrk Ty Ii (Y) 4" (Sld)DollarsAnd CentsLf 66,800.000 119 666 6231 007 Pavement Sealer (Arrow)DollarsAnd CentsEa 14.000 120 666 6275 007 Re Pm Ty I(Y)4"(Brk)(090mil)(Callout)DollarsAnd CentsLf 15,390.000 121 666 6276 007 Re Pm Ty I(Y)4"(Sld)(090mil)(Callout)DollarsAnd CentsLf 66,800.000 122 666 6283 007 Ref Prof Pav Mrk Ty I(W)4"(Sld)(090mil)DollarsAnd CentsLf 65,726.000 123 672 6009 Refl Pav Mrkr Ty Ii-A-ADollarsAnd CentsEa 1,560.000 124 677 6001 Elim Ext Pav Mrk & Mrks (4")DollarsAnd CentsLf 45,700.000 125 730 6107 Full - Width MowingDollarsAnd CentsCyc 3.000 126 734 6002 Litter RemovalDollarsAnd CentsCyc 3.000 127 738 6010 Cleaning / Sweeping (Spot)DollarsAnd CentsMi 6.400 128 3076 6003 D-Gr Hma Ty-B Pg64-22 (Exempt)DollarsAnd CentsTon 9,837.000 129 3076 6048 D-Gr Hma Ty-D Pg76-22DollarsAnd CentsTon 5,973.000 130 3076 6051 D-Gr Hma Ty-D Pg76-22 (Level-Up)DollarsAnd CentsTon 1,399.000 131 3076 6066 Tack CoatDollarsAnd CentsGal 5,395.000 132 3085 6001 Underseal CourseDollarsAnd CentsGal 35,181.000 133 6001 6002 Portable Changeable Message SignDollarsAnd CentsEa 4.000 134 6185 6002 002 Tma (Stationary)DollarsAnd CentsDay 28.000 135 6185 6003 002 Tma (Mobile Operation)DollarsAnd CentsHr 291.000 136 7251 6001 Subsurface Util Locate (OutsideRdbed)DollarsAnd CentsEa 5.000 137

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents