Similar Projects
Upper Main Street Parking Lot
Bidding
Bridgton, ME

Portland - Region 1 Signal Improvements and Sidewalk Ramp Reconstruction
Results
Portland, ME 04101

Oxford Street Sidewalk Improvement Project
Results
Less than $600,000 est. value
Portland, ME

Portland Transportation Center Neighborhood Byway
Results
Less than $274,000 est. value
Portland, ME 04101

Route 302 and Route 35 Improvements Project
Results
Naples, ME

2020 Tuttle Road Sidewalk Extension and Road Realignment
Results
Cumberland, ME 04021

Evergreen Cemetery Admin Building ADA Accessibility Ramp Construction
Results
Less than $32,000 est. value
Portland, ME 04103

Wishcamper Parking Lot Project
Results
Portland, ME 04100

Walking Trail
Results
Casco, ME

Route 35 Sidewalk Improvements
Results
Windham, ME 04062

Brighton Avenue - Taft Avenue to Westbrook City Line Paving & Sidewalk Improvements Project
Results
Less than $860,000 est. value
Portland, ME 04101

2020 Brick Sidewalk Rehabilitation Project
Results
Less than $450,000 est. value
Portland, ME

Portland Bayside Trail Improvements
Results
Less than $310,000 est. value
Portland, ME

Marginal Way Improvements
Results
Less than $1,000,000 est. value
Portland, ME

Cedar Street Parking Facility
Results
Brunswick, ME 04011

Last Updated 06/25/2020 09:22 AM
Project Title

Sidewalk and Pedestrian Safety Improvements Cottage Road, Broadway, and Waterman Drive

Physical Address View project details and contacts
City, State (County) South Portland, ME   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

These sidewalk and pedestrian improvements are located along Cottage Road from Pine Street to Sawyer Street, Broadway from Anthoine Street to Elm Street, and Waterman Drive from Broadway to Erskine Drive in South Portland. The work includes: the reconstruction of existing concrete and bituminous sidewalks, the installation and reset of granite curbing, some closed drainage improvements, the installation of solar powered Rectangular Rapid Flashing Beacons (RRFB’s) and other pedestrian signal equipment, and associated work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents