Similar Projects
Last Updated | 07/19/2023 12:26 PM |
Project Title | Replace HVAC and Boiler-Riverbend Treatment Center |
Physical Address | View project details and contacts |
City, State (County) | Saint Joseph, MO 64507 (Buchanan County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $442,500 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replacement of HVAC Equipment & the Boiler System. Brass ball valves. Bronze ball valves. Bronze swing check valves. Iron swing check valves. Bronze gate valves. Iron gate valves. Bronze globe valves. Iron globe valves. The project includes the replacement ofHVAC Equipment and the Boiler System at Riverbend Treatment Center MBE/WBE/SDVE Goals: MBE 10%, WBE 10%, and SDVE 3%. NOTE: Only MBE/WBE firms certified by the State ofMissouri Office ofEqual Opportunity as ofthe date of bid opening, or SDVE(s) meeting the requirements ofSection 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project. If you want to verify that you are uploading documents correctly, please contact Paul Girouard: 573-751-4797, paul.qirouard@oa.mo.gov ; April Howser: 573-751-0053, April.Howser@oa.mo.gov ; or Mandy Roberson: 573-522-0074, Mandv.Roberson@oa.mo.gov. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |