Similar Projects
Roadway Improvements
Infrastructure
Design
$200,000 CJ est. value
Beardstown, IL 62618

Roadway Improvements
Infrastructure
Design
$200,000 CJ est. value
Beardstown, IL 62618

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

RR-21-4821 Pavement Repairs
Infrastructure
Results

8.9 Miles of Cape and Fog seal, Bump Grinding and Patching on IL 78 from the Mason County line, through Chandlerville, to 0.1 Miles North of IL 125 in Virginia
Infrastructure
Results
IL

Outdoor Lighting
Infrastructure
Design
$80,000 CJ est. value
Beardstown, IL 62618

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Walking/Bike Path Improvements
Infrastructure
Design
$200,000 CJ est. value
Beardstown, IL 62618

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Pool Painting - Sudbrink Waterpark
Infrastructure
Design
$50,000 CJ est. value
Beardstown, IL 62618

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Post-Bid
Schaumburg, IL 60194

RFQ - Various Phase II Traffic Signal Coordination and Timing (SCAT) Projects, Various Routes
Term Contract
Post-Bid
$300,000 CJ est. value
Springfield, IL 62703

Last Updated 03/22/2023 06:38 AM
Project Title

Edwards Street Sanitary Sewer Replacement From 2nd To 3rd Streets

Physical Address View project details and contacts
City, State (County) Beardstown, IL 62618   (Cass County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $806,754 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Hard copies of the Contract Documents are available for a nonrefundable fee of $60.00 per set and can be obtained from the Engi-neer at: Benton & Associates, Inc. 1970 West Lafayette Avenue Jacksonville, IL 62650 217-245-4146 (phone) 217-245-4149 (fax) All questions of a technical nature regarding the project will only be an-swered in writing by Addendum. Any questions may be submitted by telephone or in writing to Greg Hillis, Project Manager, ghillis@bentonassociates.com, 217-245- 4146,or at the Pre-Bid Meeting. Questions should be submitted to the Engineer no later than five (5) working days prior to the bid date. All proposals must be made on the Proposal forms furnished by the Owner's Project Engineer and shall contain the signature of the Bidder. Not less than the general prevailing rate of wages, including general pre-vailing rate for legal holidays and/or overtime work in the locality, must be paid for by craft or type of workman or mechanic needed to execute the Contract or perform the work. All bidders are required to advertise subcontracting opportunities and to negotiate with Business Enterprise Program certified vendors prior to bid opening as required in the BEP Utilization Plan included in the Contract Docu-ments. Failure to document such affirmative efforts shall be deemed, relative to Business Enterprise Program Compliance, non-responsive. As required by the award conditions of the Rebuild Illinois Grant Pro-gram, the goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Business Enterprise Program Goal (Total) 9% Minority Business Enterprise Goal 4% Women Business Enterprise Goal 5% The Owner may waive any informalities or minor defects or reject any or all bids, and to determine which is the lowest, responsive, responsible bid based upon the Base Bid for the work.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents