Similar Projects
2022 Bond Construction & Renovations
New Construction, Renovation
Conception
$50,000,000 est. value
Cedar Rapids, IA

Jefferson Intermediate & Middle School Renovations
Renovation
Conception
Pella, IA 50219

2021 Measure - Boyer Valley Community Schools
Renovation, Addition
Design
$8,200,000 est. value
Dunlap, IA

2021 Bond- Akron - Westfield Community School District
Renovation
Design
Less than $8,900,000 est. value
Akron, IA

Kirn Middle School SPED Renovations
Renovation
Bidding
$500,000 est. value
Council Bluffs, IA 51503

Dallas Center-Grimes High School Renovation
Renovation
Bidding
$10,960,347 est. value
Grimes, IA 50111

Okoboji Commons and Multi-Purpose Addition
Addition
Post-Bid
Milford, IA 51351

Marion High School Activities Complex
New Construction
Post-Bid
Marion, IA 52302

Jesup Community School District ADA Improvements
Results
$289,000 est. value
Jesup, IA 50648

Camanche High School Phase III
Renovation, Addition
Results
$9,000,000 est. value
Camanche, IA 52730

Sixth Middle School Construction
New Construction
Pending Verification
Waukee, IA

Pella High School Athletics Stadium Additions
Addition
Conception
Pella, IA 50219

Central Campus Multipurpose
Renovation
Bidding
$921,000 est. value
Des Moines, IA 50309

Audubon CSD MS and HS Facility Improvements - Interior
Renovation
Post-Bid
Audubon, IA 50025

Williams Lower Level Restroom
Renovation
Results
Davenport, IA 52804

Last Updated 06/15/2022 11:58 PM
Project Title

Middle School Family Consumer Science Remodel

Physical Address View project details and contacts
City, State (County) Fort Dodge, IA 50501   (Webster County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of a 1,568 square foot remodeling of the existing Family Consumer Science Classroom located on the second floor of the Middle School including: two (2)new food preparation work stations with new casework; replacing the kitchen countertop and casework; replacing two sinks, and adding two new sinks; removing 1,100 SF of carpet tile and approximately 468 SF of 12" x 12" vinyl floor tile; providing new 12" x 12" vinyl floor tile throughout the 1,568 SF; installation of range hoods for eight (8) electric ranges (including six (6) new and relocating two (2) existing hoods; and related mechanical, electrical, plumbing alterations.

Details

Middle/Senior High School, Renovation, 1,568 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents