Similar Projects
Switches and Ups for The Pikes Peak Library District
Post-Bid
Colorado Springs, CO 80900

Automatic Throw Over Switch (ATO) Project
Post-Bid
Colorado Springs, CO 80947

Smartsensor Installation
Results
Less than $300,000 est. value
CO

Aclara Electric Meters
Term Contract
Results
Colorado Springs, CO 80947

On-Call and Emergency Electrical Services
Term Contract
Post-Bid
Colorado Springs, CO 80903

Generators and Emergency Response Equipment
Results
Fountain, CO 80817

Installation of New Premise Wiring and Removal of Existing Outdated Premise Wiring in Building 845 on Peterson AFB, CO
Post-Bid
Colorado Springs, CO

Transformer Alliance: Single and Three Phase Padmount, Overhead and Submersible
Term Contract
Results
Colorado Springs, CO 80947

Turbine and Generator Blanket Work and Front Range Power Plant Steam Turbine and Generator Inspections
Post-Bid
Fountain, CO 80947

UPS Battery Replacement and Installation
Results
Fort Carson, CO 80913

On-Call Emergency Generator Maintenance and Services
Post-Bid
Colorado Springs, CO 80910

Nixon ZD Switchgear
Results
Fountain, CO 80817

Main Electrical System and Emergency Generator Replacement, CC, Phase 1
Post-Bid
$650,000 to $850,000 est. value
Colorado Springs, CO 80906

Transformer (750KVA) Pad Mount Replacement and Installation
Results
Colorado Springs, CO 80914

All Division Electrician Services
Post-Bid
CO

Reported 01/11/2020 12:00 AM
Project Title

PAFB Bldg 845 Premise Wiring

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80914   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Peterson Air Force Base, Colorado is seeking potential sources to provide non-personal services for Installation of New Premise Wiring. The Contractor shall provide all materials, transportation, labor, management, tools, and other incidentals necessary to engineer, furnish, install and test (EFI&T) new unshielded Category 6 (CAT 6) premise wiring within building 845 at Peterson AFB, CO.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents