Similar Projects
Reservoir Rehabilitation
Bidding
Tucson, AZ

Arizona Avenue Waterline Replacement - 10th Street to 15th Street
Infrastructure
Bidding
Yuma, AZ 85364

Kyrene Middle School Underground Piping Replacement
Term Contract
Post-Bid
$3,200,000 est. value
Tempe, AZ 85284

Blanca Wastewater System Improvements
Post-Bid
Nogales, AZ 85621

Lower Greasewood Water System Improvements
Results
$6,000,000 to $7,000,000 est. value
Fort Defiance, AZ

The Grid Mixed Use Project Site Improvements CMAR
Renovation
Results
$2,500,000 to $4,500,000 est. value
Mesa, AZ 85201

Fire Hydrant, Unidirectional Flushing Services, and Valve Preventative Maintenance
Term Contract, Infrastructure
Bidding
Tucson, AZ

VA Tucson Upgrade Water Infrastructure System
Post-Bid
$2,000,000 to $5,000,000 est. value
Tucson, AZ

Construction of a Water and Sewer Line
Results
Less than $332,464 est. value
Tolleson, AZ 85353

Construction of the Valley Vista Water Main Extension Project
Infrastructure
Bidding
Somerton, AZ

Water Loading Station Maintenance
Post-Bid
Fort Defiance, AZ 86504

Water Meters
Results
Glendale, AZ 85301

Cooling Tower and Closed Loop Water System Treatment and Maintenance
Term Contract, Infrastructure
Bidding
Mesa, AZ

Request for Quotes to Replace the Cooling Water Strainers
Post-Bid
Parker, AZ

Water Main Extension - Gunsmoke Road
Results
Less than $104,870 est. value
Maricopa, AZ 85139

Last Updated 06/01/2021 09:23 AM
Project Title

North 8th Street and East Huning Waterline Improvements

Physical Address View project details and contacts
City, State (County) Show Low, AZ 85901   (Navajo County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes, but is not necessarily limited to, installing approximately 660 LF of new 8-inch C-900 PVC waterline, fire hydrants, water services, and required fittings. Any pavement or concrete removed during the installation of the new line will be replaced. The work includes all required labor, material, incidentals, transportation, traffic control, and services required for the project to complete a usable and operable facility in accordance with all pertinent codes and regulations as necessary to complete the job in a workmanlike manner as shown on the Construction and Bid Documents. This work shall take place along North 8th Street and East Huning in Show Low, Arizona, 85901.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents