Similar Projects
South Hartford Conveyance and Storage Tunnel - Tunnel Pump Station Contract No. 3
New Construction
Bidding
Hartford, CT

Provision and Installation of a Prefabricated Pump Station
Post-Bid
Groton, CT 06340

Construction of Stormwater Pumping Station, Stratford, CT
Post-Bid
$5,000,000 to $10,000,000 est. value
Stratford, CT

Wastewater Pump Stations Rehabilitation Project
Renovation
Results
Stafford, CT 06615

Easton Turnpike Pump Station and Force Main Replacement
Results
Fairfield, CT 06824

Evergreen Avenue Sewer Pump Station Supply and Installation of Fourth Pump
Infrastructure
Post-Bid
Waterford, CT 06385

Steele Street Pump Station Modifications
Renovation
Results
Less than $443,700 est. value
New Britain, CT

Riverdale Farms Sanitary Sewer Pump Station Upgrades
Renovation
Post-Bid
Avon, CT 06001

Route 133 Pump Station Improvements
Results
Brookfield, CT

Woodruff Hill Sanitary Sewage Pump Station at E. Commerce Drive
New Construction
Post-Bid
Oxford, CT

Construction of Raymark Stormwater Pumping Station, Stratford, Ct
Results
Stratford, CT

Construction Of The Old Lyme Shared Sewer Infrastructure At Pump Station
New Construction
Post-Bid
Manchester, CT

Gulf Street Sanitary Pump Station Repairs
Results
Milford, CT 06460

Old Lyme Associations Pump Station
New Construction
Post-Bid
Old Lyme, CT

Wet Well Ventilation Upgrades for Gravel Street Pump Station
Results
Mystic, CT 06355

Last Updated 10/12/2021 09:26 AM
Project Title

West Queen Street Pump Station Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Southbury, Southington, CT 06488 (Hartford, New Haven Counties)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of replacing a dry pit wastewater pump station with a prepackaged precast concrete submersible type pump station, installation of outdoor generator, electrical enclosures, and site features, and demolition of an above-grade building.

Details

Division 02 - Existing Conditions, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials, Lead Remediation, Lead-Based Paint Remediation, Lead-Based Paint Abatement, Removal and Disposal of Material Containing Lead, Lead-Based Paint Removal and Disposal.
Division 03 - Concrete.
Division 07 - Thermal and Moisture Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Piping, Public Water Utility Distribution Piping, Ductile Iron Public Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents