Similar Projects
5th Street Bridge Utility Relocation
Infrastructure
Bidding
$375,000 est. value
New Smyrna Beach, FL 32168

2018 Water Main Improvements - Phase 1A
Infrastructure
Bidding
Margate, FL

Water Transmission System Subaqueous Crossings Pipeline Support Remediation and Signage
Post-Bid
Key West, FL 33040

Testing, Maintenance and Certification of Backflow Preventers
Post-Bid
Miami, FL 33010

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

Oleander Avenue Potable Water Main
Results
Less than $656,319 est. value
Mexico Beach, FL 32410

Newberry Lane Forcemain and Watermain Project
Infrastructure
Bidding
Newberry, FL 32669

Construction Services For Epperson North District Improvements Pasco County
Post-Bid
Wesley Chapel, FL

Green Meadows Water Main Replacement
Results
Less than $250,000 est. value
Belleview, FL

Bamford Park and University Drive Reclaimed Water Mains
Infrastructure
Bidding
$1,400,000 est. value
Davie, FL 33328

Advanced Metering Infrastructure Program
Post-Bid
Clewiston, FL 33440

GTL Dewatering Building Drain/Vent Pipe Replacement
Results
Fort Lauderdale, FL 33316

Water Leak Detection And Monitoring System
Term Contract, Infrastructure
Bidding
Fort Lauderdale, FL

Rice Road Potable Water Main Extension
Post-Bid
Plant City, FL 33566

Potable Water Main Improvements Phase 1 Sylvania Boulevard from SW 9th Street to SW 57th Avenue and SW 58th Avenue from SW 9th Street to SW 15th Street and SW 9 Terrace from Sylvania Boulevard to SW 58 Avenue
Results
Less than $1,500,000 est. value
West Miami, FL 33144

Last Updated 01/25/2022 12:28 PM
Project Title

NEFSH Water Main Extensions

Physical Address View project details and contacts
City, State (County) Macclenny, FL 32063   (Baker County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,153,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, materials, and equipment to install approximately 4,470 LF of 8" to 16" fusible PVC water main via directionally drill; 5,220 LF of 8" to 16" PV water main via conventional installation; valves, fittings, fire hydrants; flowmeters; pressure reducing/sustaining valve; and associated restoration.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents