Similar Projects
Gym Floor Re-Sand Entire 15,600 Sq-ft Floor to Bare Wood, Re-stripe Game
Renovation
Sub-Bidding
$60,000 CJ est. value
Ann Arbor, MI 48104

U.S. Coast Guard Station Saint Ignace Housing Flooring
Renovation
Sub-Bidding
$400,000 CJ est. value
Saint Ignace, MI 49781

Flooring Project
Post-Bid
Romulus, MI

Carpet/Vinyl Installation
Alteration
Post-Bid
Grand Rapids, MI

Repair Floors Base Wide
Term Contract
Results
$500,000 to $1,000,000 est. value
Battle Creek, MI 49037

Carson City Correctional Facility Food Service Flooring Replacement
Alteration
Results
Carson City, MI 48811

Carpeting
Alteration
Post-Bid
Grand Rapids, MI

Mortuary Science Flooring Replacement - 2022
Alteration
Results
$500,000 est. value
Detroit, MI 48202

Community Center Carpet
Alteration
Post-Bid
Grand Haven, MI

Carpet Projects
Alteration
Results
Wayland, MI 49348

Flooring Replacement
Alteration
Post-Bid
Rochester Hills, MI 48306

Carpet Removal and Installation
Alteration
Results
Suttons Bay, MI 49682

Solar Panels And Kinetic Flooring
Alteration
Post-Bid
Brighton, MI

Gym Flooring System Removal/Installation
Alteration
Results
Battle Creek, MI

Additional Flooring and Paint
Alteration
Post-Bid
Boyne City, MI

Last Updated 05/16/2023 02:35 PM
Project Title

HPS - Gym Carpet and Additional Flooring 2023

Physical Address View project details and contacts
City, State (County) Caro, MI 48723   (Tuscola County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Complete removal and installation of carpet in HPS Gymnasium, HPS A-1, A-2, A-4, and Transition Prep Classroom. Gym floor will maintain the same line format on installation of the new floor using a light gray accent color for lines. Gym flooring must include carpet for the stage platform. A-4 will have carpet and tile removal and installation. A-4 will use remnant carpet to cover half the room and the remaining half will install LVT. A-1 and A-2 will be complete room carpet with removal and installation. Install LVT in the OP/PT closet area with district stock tile. Transition will be removal and installation of complete carpet. All rooms will have a new rubber base installed also. Bid must include possible floor sealer for remnant glue bleed thru. Bid must also include a dumpster for all material waste. Vendors must maintain a clean and safe environment of all district property at all times with final cleaning at completion of the project. Bids must be separated into areas of work, Gym, Transition, A-1 and A-2, A-4, and OP/PT Closet. Please direct all questions to: Jared Bush Transportation Director/Facility Manager 989-673-2144 x30362 jbush@tuscolaisd.org Bids will be awarded on or before June 19, 2023. Bids are to be firm for at least 120 days or until the project is completed Final payment to the vendor shall be due 30 days after completion of their contract work and acceptance by the owner or as indicated by the vendor on the accepted bid Completion of Work By Aug. 11, 2023 with Timeline of Project The Tuscola I.S.D. Reserves the Right to Reject Any Bids

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents