Similar Projects
Piper Lake North
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Kansas City, KS 66109

Tower View Apartments
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
Kansas City, KS 66101

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

FOLS - Construct two ABA compliant walkways
Infrastructure
Post-Bid
$100,000 CJ est. value
Larned, KS 67550

Great Bend Police Station and Court Facility
New Construction, Infrastructure
Post-Bid
$8,000,000 CJ est. value
Great Bend, KS 67530

Shawnee Mission School District Westridge Middle School Renovations and Addition
Addition, Demolition, Renovation, Infrastructure
Results
$1,785,953 CJ est. value
Overland Park, KS 66214

Brown Avenue Improvements (18 th to 16 th Street)
Infrastructure
Results
$486,827 CJ est. value
Osawatomie, KS 66064

Bubble Room Coin Operated Laundry / Shawnee
Renovation, Infrastructure - 4,203 SF
Construction
$160,000 CJ est. value
Shawnee, KS 66203

Treadway Apartments
New Construction, Infrastructure - 505,500 SF
Construction
$200,000,000 CJ est. value
Gardner, KS 66030

Club Carwash - West 21st Street / Wichita
Demolition, New Construction, Infrastructure
Pending Verification
$1,300,000 CJ est. value
Wichita, KS 67203

Azura Credit Union / Mission
Renovation, Infrastructure - 2,295 SF
Pending Verification
$900,000 CJ est. value
Mission, KS 66202

Cedar Canyon West
New Construction, Infrastructure
Conception
$500,000,000 CJ est. value
Lenexa, KS 66215

143-Met
New Construction, Infrastructure - 339,070 SF
Design
$93,000,000 CJ est. value
Overland Park, KS 66223

Shawnee MedAct Station 1131
New Construction, Infrastructure
Post-Bid
$2,068,000 CJ est. value
Shawnee Mission, KS 66217

Last Updated 09/12/2023 01:38 PM
Project Title

Solar PV Design and Installation

Physical Address View project details and contacts
City, State (County) Abilene, KS 67410   (Dickinson County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK: The City intends to contract for solar PV systems to be installed on the roof or nearby ground of multiple buildings: The City is looking for long-term energy solutions. The intent is to maximize the value via a design/build approach where the bidder/proposer will provide the design and engineering specs based on specific PV solar sizes. Attachment A, has a list of accounts and addresses that need to be reviewed and analyzed. The City will initially target these three (3) sites for solar PV systems based upon a cost-benefit analysis. This analysis needs to include preliminary drawings of the sites with the solar panel location, turnkey pricing with available incentives, annualized solar PV production model over 25 years and the associated utility savings. Details of the utility savings would need to be provided to validate the estimated savings. Only Tier 1 equipment will be considered. Additional sites will be considered upon completion of this initial project and completion of the City's Comprehensive Plan in January 2024. The systems will tie into the respective building's electrical system with the intent of entering into either a Net Metered or Parallel Generation agreement with Evergy, depending on the cost-benefit. Installations of this project will begin after a City Purchase order is issued. Design & Pre-Install System design by bidding solar engineer. Submit design for structural and electrical engineering stamps as required. Submit system design to utility company for approval of Net Metering and/or Parallel Generation. Interconnection application submitted to utility company All project permits filed and submitted Installation scheduled with client Heritage Commission/State Historical Preservation Office notification/approval to applicable sites Installation Install System test performed for proper function. Inspections scheduled if needed Submit necessary documentation to utility company Post-Installation Utility company inspection integrations Contractor completes final system checks, energizes system, and provides operational walk-thru with clients Contractor provides system monitoring and alerts training, and documentation. Specifications: The Solar PV System. The Solar PV system will be rated the size in kW direct current. Solar Panels selected must be Tier 1 panels with necessary rapid shutdown devices. Section 1 - Scope of Work provides Contractors a description of the goods/services being purchased under this RFP/RFB. This RFP/RFB, Response, including all documents appended to the response and expressly agreed to by the parties as set out in the Award Contract, any purchase order, and Award Contract, as applicable, will hereafter be collectively referred to as the "Agreement". 1.1 SCOPE OF WORK The City intends to contract for solar PV systems to be installed on the roof or nearby ground of multiple buildings: 1. The City is looking for long-term energy solutions. The intent is to maximize the value via a design/build approach where the bidder/proposer will provide the design and engineering specs based on specific PV solar sizes. 2. Attachment A, has a list of accounts and addresses that need to be reviewed and analyzed. 3. The City will initially target these three (3) sites for solar PV systems based upon a cost-benefit analysis. This analysis needs to include preliminary drawings of the sites with the solar panel location, turnkey pricing with available incentives, annualized solar PV production model over 25 years and the associated utility savings. Details of the utility savings would need to be provided to validate the estimated savings. Only Tier 1 equipment will be considered. 4. Additional sites will be considered upon completion of this initial project and completion of the City's Comprehensive Plan in January 2024. 5. The systems will tie into the respective building's electrical system with the intent of entering into either a Net Metered or Parallel Generation agreement with Evergy, depending on the cost-benefit. Installations of this project will begin after a City Purchase order is issued. Design & Pre-Install 1. System design by bidding solar engineer. Submit design for structural and electrical engineering stamps as required. 2. Submit system design to utility company for approval of Net Metering and/or Parallel Generation. Interconnection application submitted to utility company 3. All project permits filed and submitted 4. Installation scheduled with client 5. Heritage Commission/State Historical Preservation Office notification/approval to applicable sites Installation 1. Install 2. System test performed for proper function. 3. Inspections scheduled if needed 4. Submit necessary documentation to utility company Post-Installation 1. Utility company inspection integrations 2. Contractor completes final system checks, energizes system, and provides operational walk-thru with clients 3. Contractor provides system monitoring and alerts training, and documentation. Specifications: 1. The Solar PV System. The Solar PV system will be rated the size in kW direct current. Solar Panels selected must be Tier 1 panels with necessary rapid shutdown devices. 2. The Roof and Mounting System. The solar panel installation shall include all necessary roof protection as required. All roof penetrations and any other roofing related work is to be completed by an authorized warranted Roofing applicator of applicable building products without exception. If the Solar Panels are to be ballasted (non-degradable material), utilizing equipment (including pads or membranes) that is designed for compatibility with identified roof system is required

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents