Similar Projects
Central Park Multi-Purpose Building Windows, Storefronts, and Doors Removal and Replacement
Bidding
Fort Lauderdale, Plantation, FL 33324

Public Works Administration Building Windows, Storefronts, Doors Removal and Replacement
Bidding
Plantation, FL 33324

Locksmith Services and Window Hardware and Shutter Service
Term Contract
Post-Bid
FL

Wooden Doors
Post-Bid
FL

Door Installation and Repair Services
Results
Fort Lauderdale, FL

Interior Window Film
Results
Coral Springs, FL

Doors, Operable Accordion
Term Contract
Bidding
Sunrise, FL

East Aquatics Door Replacement
Post-Bid
Miramar, FL

Holiday Park Store Front Doors and Windows
Results
Less than $15,000 est. value
Fort Lauderdale, FL

Doors and Windows Replacement Services
Post-Bid
Plantation, FL 33313

Main Entrance Impact Doors at Emergency Operations Center (EOC)
Results
Less than $32,680 est. value
Plantation, FL

Impact Windows and Doors Purchase and Installation Services (Davie)
Post-Bid
Davie, FL 33330

Fire Station Bay Door Replacement
Results
Sunrise, FL

Wooden Doors
Post-Bid
Sunrise, FL 33351

Overhead Doors - Hydraulic Gate Operators Repair and/or Replacement Services
Term Contract
Results
Less than $1,300,000 est. value
FL

Reported 05/02/2019 12:20 PM
Project Title

Replacement Parts and Installation of Jail Sliding Door Mechanisms

Physical Address View project details and contacts
City, State (County) Pompano Beach, FL 33069   (Broward County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1. Provide all parts and labor to replace jail cell existing Southern Steel sliding door mechanisms with RR Brink 57700 mechanisms. Existing doors will be re-used. This will be a turnkey operation. 2. Proposer shall insure that all retained equipment shall be compatible with new equipment. 3. Replace or re-work existing housings and covers, all cables as necessary to complete required services. 4. New replacement mechanisms to be installed in existing Master Release Cabinets(MRC). 5. Existing MRC cabinets should be cleaned and prepared to accept new mechanism(s) 6. New RR Brink deadlocks with paracentric keys 7. All adjustments, lubrications, testing to be completed prior to final acceptance by BSO 8. Proposer will be responsible for providing dumpster for unusable parts and to ensure safe disposal including recycling of parts wherever possible. BSO will provide site for dumpster in a convenient area, close in proximity to exit door(s). 9. Proposer will be responsible for providing Air scrubber or purification system for work area.
Details
Division 08 - Openings, Doors and Frames, Windows.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents