Similar Projects
Natural Areas Maintenance and Controlled Burning Services
Term Contract
Post-Bid
Half Day, IL 60069

Two Dri-Steam Gas to Steam Humidifiers
Post-Bid
Des Plaines, IL 60016

Fuel Storage Improvements
Results
Less than $831,650 est. value
Woodridge, IL 60517

CNG Fuel Station Maintenance
Term Contract
Results
Downers Grove, IL 60515

2021 Lasalle County Highway Fuel
Term Contract
Post-Bid
Ottawa, IL

Removal of Underground Storage Tanks
Results
Rockford, IL 61109

2021 Above Ground Fuel Tank
Term Contract
Post-Bid
Richton Park, IL

2020 Underground Storage Tank System Removal
Results
Warrenville, IL 60555

Oil Tank Abatement
Post-Bid
$250,000 to $500,000 est. value
Chicago, IL 60607

Installation of One (1) Above Ground Diesel Fuel Storage Tank
Results
Addison, IL 60101

Underground Storage Tank System Upgrade
Infrastructure, Alteration
Post-Bid
River Forest, IL

Rehabilitation of the 750,000 Gallon Spheroid High Tank
Results
Carol Stream, IL

Southwest 3rd Avenue Natural Gas Replacement
Infrastructure
Post-Bid
Aledo, IL 61231

Removal Of Underground Storage Units
Results
Rockford, IL 61109

Maintenance Garage Insulation and Underground Storage Tank
Infrastructure
Post-Bid
Milan, IL

Last Updated 01/19/2022 09:22 AM
Project Title

Above Ground Tank Purchase and Installation

Physical Address View project details and contacts
City, State (County) Richton Park, IL   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New tanks need to be minimum of: One (1) 2500 gallon and one (1) 1000 gallon tank Double wall UL2085 Listed “Protected” Tank. Ballistics and impact protection per UL2085. Both the inner and outer steel tanks are built to UL Standards. National Fire Protection Association (NFPA) 30 & 30A. International Fire Code (IFC). Steel Tank Institute (STI) Standard F942. Plumbing of tanks and impact shut off valves. Provide required permits / Inspections, Variations be can accepted at city discretion All signage required and hazmat decals

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents