Description |
Improvements to the City of Socorro Water Reclamation Facility to include removal of three (3) SBR Blowers and 12-inch ductile iron SBR header piping, including fittings, butterfly valves, etc.; installation of three (3) new SBR Blowers, including VFD`s, electrical and controls, DO control, including transducers, wire and conduit, new 12-inch welded steel header piping, including fittings and new manual and motor actuated butterfly valves ; structural improvements to the existing SBR, Digester and Thickener basins, including SBR Basin #1 North Wall Stabilization, severe crack repair, minor crack repair, etc.; and other incidental work identified in a base bid schedule and two additive bid schedules, to complete a project within the available funding. Bids will be received for a single prime Contract. |
Details |
Division 02 - | Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling. | Division 03 - | Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete. | Division 04 - | Masonry, Unit Masonry. | Division 05 - | Metals, Structural Metal Framing. | Division 06 - | Wood, Plastics, and Composites, Rough Carpentry. | Division 07 - | Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers. | Division 08 - | Openings, Doors and Frames, Windows, Hardware, Glazing. | Division 09 - | Finishes, Flooring, Painting and Coating. | Division 10 - | Specialties, Signage, Safety Specialties, Lockers, Flagpoles. | Division 11 - | Equipment, Laboratory Equipment. | Division 12 - | Furnishings. | Division 13 - | Special Construction. | Division 14 - | Conveying Equipment, Lifts. | Division 21 - | Fire Suppression, Fire-Extinguishing Systems. | Division 22 - | Plumbing. | Division 23 - | Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units. | Division 26 - | Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting. | Division 27 - | Communications, Data Communications, Audio-Video Communications. | Division 28 - | Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm. | Division 31 - | Earthwork, Site Clearing, Grading, Earthwork Methods. | Division 32 - | Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses. | Division 33 - | Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities. | Division 40 - | Process Integration, Water Process Piping, Instrumentation and Control for Process Systems. | Division 41 - | Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists. | Division 44 - | Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment. | Division 46 - | Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment. |
|