Similar Projects
Lumberyard Affordable Housing Development
New Construction, Infrastructure
Design
$400,000,000 CJ est. value
Aspen, CO 81611

2022 Asphalt Overlay Project
Infrastructure
Design
$500,000 CJ est. value
Aspen, CO 81611

RFP Engineering - Castle Creek Bridge Underpass Retaining Wall Assessment and Design
Infrastructure
Bidding
$60,000 CJ est. value
Aspen, CO 81611

RFP Design of Water Treatment Facility Campus Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Aspen, CO 81611

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Horse Ranch Water Line
Infrastructure
Post-Bid
$150,000 est. value
Snowmass Village, CO 81615

Red Mountain Water System Improvements
Infrastructure
Results
Aspen, CO

As Needed Excavation Services
Term Contract
Results
Aspen, CO

Snowmass Water and Sanitation District Edgewood Water Line Connection
Infrastructure
Construction
$200,000 CJ est. value
Snowmass Village, CO 81615

Snowmass Water and Sanitation District Edgewood Water Line Connection
Infrastructure
Construction
$200,000 CJ est. value
Snowmass Village, CO 81615

New Terminal - Aspen-Pitkin County Airport
Addition, Infrastructure
Pending Verification
$121,800,000 CJ est. value
Aspen, CO 81611

Aspen Valley Hospital Phase 4
New Construction, Renovation, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Aspen, CO 81611

Snowmass Center Redevelopment
Demolition, Renovation, Infrastructure - 170,101 SF
Design
$5,000,000 CJ est. value
Snowmass Village, CO 81615

Owl Creek Trail Project Phase 2
Infrastructure
Bidding
$3,000,000 CJ est. value
Snowmass Village, CO 81611

North Star Parking Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Aspen, CO 81611

Last Updated 04/24/2023 01:06 PM
Project Title

Garmisch and Hallam Stormpipe and Watermain Replacement Project

Physical Address View project details and contacts
City, State (County) Aspen, CO 81611   (Pitkin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 13 the project was awarded to Heyl Construction Inc, awarded amount not available. Reference Number 0000312279 Install next section of stormpipe in alignment with the Garmisch St Storm Masterplan. The corrugated metal pipe in Garmisch is failing in several sections; including areas along the block between Main to Hallam. Several hundred feet of pipe bottom is completely rusted out, and the bedding is exposed and eroding. This project will replace the pipe to restore proper function and reduce safety hazards associated with failing pipe. Modify Stormwater Infrastructure to alleviate drainage issues that prevent safe loading/unloading for the Yellowbrick building. Project includes the replacement of 2 drywells that are not functioning causing negative affect to the building. Major icing issue will be resolved due to drainage improvements. Replace the older Cast line watermain on Hallam from Garmisch to 1st St with DIP. Install EV charging station base at the Yellowbrick. Question Deadline :03/24/2023 at 11:59 PM Questions are submitted online Yes - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 %

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents